Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Selling SREC's question

NC-2009 EAc2:On-Site Renewable Energy
posted by  Todd Bundren  on 

I am working on a project with two large solar arrays on a parking garage, both are separately metered.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Oct 10, 2012, 7:54 pm

Measurement option and 500fc limit

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Erin Holdenried  on 

For Option 3 Measurement, can an area with measurement greater than 500 fc count towards the credit if the space has glare control devices, such as internal shades?

2
Director of Sustainability
DBR Engineering Consultants
LEEDuser Basic Member
244 thumbs up
Wed Oct 10, 2012, 7:41 pm

Are you kidding me?

General forums
posted by  Karen Joslin  on 

Opened the email with the "news" and instead of adding the very much needed individual memership structure for all those folks out there whose organization will not join USGBC or connect them to th

7
Wed Oct 10, 2012, 5:40 pm

Vegetated areas

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Patricia Missawa  on 

I’m having some doubts on how to define the stormwater volume treated by different types of vegetated areas since in Brazil we don’t have any study related to it. 1- If my project has a flat vegeta

5
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Wed Oct 10, 2012, 5:24 pm

For EBOM, do we do a threat rating assessment?

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Lee Ann Walling, LEED AP ND   on 

We are a state natural resources agency with lots of bird strikes, so we would like to pursue this credit as part of our LEED EB: O&M project.

2
Sites Technical Specialist, LEED
USGBC
LEEDuser Premium Member
47 thumbs up
Wed Oct 10, 2012, 3:12 pm

How many times can the appeal be submitted?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  dia2000@gmail.com dia2000@gmail.com  on 

As of my understanding, appeals can be submitted as many times as the project team wishes.

3
Wed Oct 10, 2012, 2:55 pm

Performance Period

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Sarah Brophy  on 

I see from the EBOM flow-chart that there is a performance period of three years in addition facade monitoring plan establishment. Am I interpreting this correctly?

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Oct 10, 2012, 2:54 pm

Geothermal (Sometimes you're in, sometimes you're out!)

CS-2009 EAc2:On-site Renewable Energy
posted by  Katie Mesia  on 

We are in schematic design on a CS project. The project will have underground parking and will use piles as a foundation.

3
Regional Director of Sustainability
Gensler
LEEDuser Basic Member
2 thumbs up
Wed Oct 10, 2012, 2:05 pm

Efficiencies for System 4 – PSZ-HP (packed roof top heat pump)

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

According to Table G3.1.1A for the baseline model I have to model System 4 – PSZ-HP (packed roof top heat pump). I’m wondering what efficiencies I have to consider.

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Oct 10, 2012, 10:28 am

Thermal comfort for fitness center

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  HOUCINE TLEMSANI  on 

I am working on a fitness center where the temperature is maintained low and the air velocities adequate thru the use of fans. The ASHRAE tool show that the people that are working out and have a

4
Tue Oct 9, 2012, 9:48 pm