Forum quick links
Air Speed Values exceed 40 fpm
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Barbara McCrary on
I've submitted this credit to USGBC and it was rejected.
How to send the documentation for the campus credits
posted by Alicia Villanueva on
We are certifying 2 buildings within a Master Site and we have registered both of them: Building A Building B Then, we have linked them with the Block Registration Tool. We don't know how to up
LEED Canada V1.1 and LEED Canada 2009. Credits MRc4 and MRc7
NC-2009 MRc7:Certified Woodposted by Keith Robertson on
In the LEED Canada reference guide V1.0, page 295 for the credit MRc4, it is stated under “Synergies and Trade-Offs […] Recycled content materials cannot be included in calculations for MR Credits
glare control devices on skylights?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Erin Holdenried on
Does anyboday know if glare control devices need to be provided on skylights?
Natural vegetation
EBOM-2009 WEc3:Water Efficient Landscapingposted by AshLee Eustace on
I'm working on a building with a large portion of natural vegetation which is not irrigated. There is also a separate area of turf, trees, shurbs that is irrigated.
Metal Studs - Hawaii
CI-2009 MRc5:Regional Materialsposted by Nicole Kimoto on
I'm sure this question has been asked before...so if the metal studs are rolled at a site within 500 miles of project location, but the raw material comes from outside 500 mile, does that % of meta
RE: LEED CI and furniture
CI-2009 MRc4:Recycled Contentposted by Chris Miller on
Just to clarify, in LEED CI (based on both the materail data spreadheet available on LEED online & in the LEED CI reference guide v2009) it states furniture cost is to be included in our total
Snow blowers and Snow plow
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Nelina Loiselle on
Do I need to include our snow blower in the Powered Equiptment inventory?
Ecotect Analysis
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Jorge Lopez de Obeso on
We are using Ecotect analysis 2011 to document credit IEQ 8.1.
Public road in the middle of Master Site
posted by LEED Pro Consultant on
Hi! We are working on a project in which there are 2 office buildings (both will seek LEED Certification) within the Master Site boundary, but it is separated in the middle by a public road.