Topic | Recent |
---|---|
Minimum Ventilation Rate ComplianceEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Kevin Aisawa on Aug 6, 2018, 2:23 pm
Hello, Our building is a 100% outside air dedicated outdoor air system (DOAS) running in demand control ventilation. Using the given VRP calculator by USGBC, our total outdoor air flow... |
|
Photoluminescent StickersNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Gera Feigon on Aug 6, 2018, 3:49 pm
Are photoluminescent stickers used for luminous egress path markings subjective to this (or any Low-emitting materials) credit? Paint and adhesive for the product are factory applied. |
|
Photoluminescent StickersNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Gera Feigon on Aug 6, 2018, 3:49 pm
Are photoluminescent stickers used for luminous egress path markings subjective to this (or any Low-emitting materials) credit? Paint and adhesive for the product are factory applied. |
|
Theater with RetailNC-2009 WEp1: Water Use Reductionposted by Summer on Aug 6, 2018, 10:09 pm
Hello everyone! I would like to clearly understand if the sink/kitchen sink for the following area will be considered in the calculation. My project is a Theater with coffee shop - NCv2009. ... |
|
Thermal Comfort Controls for 100% of Shared Multioccupant SapcesCI-v4 EQc5: Thermal comfortposted by Chanyang Shin on Aug 7, 2018, 10:33 am
Hi, I'm a mechanical engineer working on a project now that is 100% open offices space, with some large conference rooms, and various "huddle" rooms (no individual offices). The huddle... |
|
Facade Composition vs. BlockingPilot-Credits SSpc55: Bird collision deterrenceposted by Heath Waldorf on Aug 8, 2018, 3:26 pm
Hi. Working on a transportation hub project where the west facing multistory 50-60' glass facade is broken up vertically by an adjacent roadway bridge that runs the length of the building at the... |
|
Energy cost- OffsetNC-2009 EAc2: On-Site Renewable Energyposted by Manikandan S on Aug 9, 2018, 8:46 am
Dear All We are working in a project where the... |
|
Hospital ClassificationCS-v4 LTc4: Surrounding density and diverse usesposted by Gera Feigon on Aug 9, 2018, 6:19 pm
I am working on a project near a medical campus and am wondering: 1) Would a major hospital qualify as a community anchor uses - commercial office or civic and community facilities medical... |
|
Non potable water for irrigation and toilets flushNC-2009 WEc1: Water Efficient Landscapingposted by Karyn Rodrigues on Aug 10, 2018, 5:36 am
Hello! I have two sources of non-potable water in the project: gray and rainwater. These two sources, combined, are enough to supply my irrigation demand and also toilets flush for the... |
|
Calculation Sourcing of Raw Material and other BPDO creditsNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Vandita Mudgal on Aug 16, 2018, 1:59 pm
Hi All, Question about the calculation around Sourcing of Raw Materials. I understand for project where actual material cost is not available, project teams can use 'Hard Cost for CSI... |