Log in
Forum
Topic

Interior cross contamination prevention out of scope-CI

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by Casey Cullen-Woods on Jul 16, 2019, 1:45 pm

I am working on a commercial interior fit out project that would like to pursue this credit. The...

Last reply: Catarina Costa Goncalves, Apr 11, 2024, 6:10 am

ANSI/BIFMA e3-2014 or e3-2012 Compliance Documentation

CI-v4 MRc5: Building product disclosure and optimization - material ingredients
posted by ESD Engineer on Jul 30, 2019, 4:34 pm

I'm looking at the certificate provided by SCS Global that states that the product is "Level 3" and "conforms to ANSI/BIFMA e3-2014e". Unfortunately the certification does not say if 3 points...

Last reply: Tristan Roberts, May 19, 2020, 10:43 am

Energy Star Target Finder in New Property Use in New Building

CI-v4 EAp2: Minimum Energy Performance
posted by Kena David on Sep 4, 2019, 12:56 pm

Our project is pursuing LEEDv4 EA Minimum Energy Performance Option 2 in a new commercial office space in a new building. The building finished construction this year, and our office spaces will...

Last reply: Kena David , Sep 4, 2019, 4:50 pm

Baseline System type and size

CI-v4 EAp2: Minimum Energy Performance
posted by Tzung-Han Ho on Apr 30, 2020, 6:16 am

Hi all,

I got a review comment as following:
"It appears that the Baseline Case water side equipment (i.e. Chillers, etc.) was selected/sized based on the project LEED CI peak...

Last reply: Marcus Sheffer, Jan 27, 2021, 2:39 pm

Zinc Anticorrosive Aerosol

CI-v4 EQc2: Low-emitting materials
posted by Andrzej Gutowski on Jun 3, 2020, 10:22 am

Dear Collegues,

We are evaluating low emmisive compliance with Zinc Spray, used to repair any issues with anticorrosive paint that might occure afer installation of HVAC components. I...

Last reply: Andrzej Gutowski, Jun 4, 2020, 3:29 am

CO2 Sensors for Phonebooths

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by LEED Pro Consultant on Jun 24, 2020, 5:56 pm

Hello our project is 3 office  floors with some spaces destined only for phonebooths wich are only designed for 1 person, however because of the small area the calculations to obtain occupant...

Last reply: Emily Purcell, Oct 4, 2022, 2:13 pm

Signed letter from Owner i.l.o. lease agreement?

CI-v4 MRc1: Long-term commitment
posted by Greg Romanczyk on Aug 4, 2020, 1:21 pm

Hello. We are working on a government project and they have asked if instead of providing the signed lease agreement (which is confidential material), if they may provide a signed letter, stating...

Last reply: Matthew Dempsey, Oct 11, 2021, 9:56 am

Purchasing off-site Renewable Energy

CI-v4 EAp2: Minimum Energy Performance
posted by Bob Adedayo on Dec 29, 2020, 5:02 pm

Hi,

I have two conflicting information as to whether or not off-site renewable eneregy can be purchased from out of State. Could you please clarify is it must be purchased in-state or if...

Last reply: Bob Adedayo, Jan 9, 2021, 5:44 pm

Mandatory to comply with ASHRAE 90.1 2010 Section 9.4.1 for Lighting Control?

CI-v4 EAp2: Minimum Energy Performance
posted by shashank gangil on Apr 19, 2021, 2:16 am

We recently received the review result of a LEED v4 Commercial Interior Project. The reviewer is asking for proof whether all mandatory requirements of section 9.4.1 for lighting control have...

Last reply: Afogreen Build, Sep 13, 2021, 8:48 pm

Health Product Declarations

CI-v4 MRc5: Building product disclosure and optimization - material ingredients
posted by John Masters on Jul 21, 2021, 5:09 pm

We are getting HPDs that have been created by the manufacturer using "HPDC Online Builder / Health Product Declaration v2.2". Are these valid to be counted as an HPD in BPDO/Material Ingredients...

Last reply: John Masters, Jul 23, 2021, 8:05 am