Log in
Forum » Middle East
Topic

GREY WATER USADGE

NC-v4.1 WEp2: Indoor water use reduction
posted by FRAN HERRERA on Nov 8, 2021, 3:17 am

Hi dear mates,

I need to add grey water usadge to Indoor water use reduction credit. According to my calculation 100 % of the WC flush water would be reused from showerhead and sinks. ...

Last reply: emily reese moody, Nov 18, 2021, 1:07 pm

Roadways materials

NC-v4 SSc4: Rainwater management
posted by Dina El-Sady on Nov 2, 2021, 11:22 am

Which would be better for this credit , a normal porous asphalt paving or a vegetated interlock ?

Last reply: Gustavo De las Heras Izquierdo, Nov 3, 2021, 1:28 am

Path 1. Divert 50% and Two Material Streams (1 point)

NC-v4 MRc5: Construction and demolition waste management
posted by Ayman Khulief on Apr 29, 2021, 4:40 am

Hello!

I represent a Solid Waste Management company often subcontracted to divert wastes from LEED projects. I have a silly question regarding Option 1. Diversion (1–2 points)...

Last reply: Susan Di Giulio, Oct 25, 2021, 2:04 pm

Free fresh air provided to small rooms

NC-v4 EQp1: Minimum indoor air quality performance
posted by Dina El-Sady on Oct 24, 2021, 7:49 am

I am working on a project with many small buildings connected to each other , some of the very small rooms may be designed with free fresh air entering through fresh air grilles not fans , is...

Last reply: Iqbal Khalilullah, Oct 25, 2021, 10:08 am

Local Food Production

Pilot-Credits SSpc82: Local food production
posted by Elcin Korukluoglu on Sep 15, 2021, 2:56 pm

We're pursuing this credit along with our textile factory project at Turkey.  We submitted for our final review, I will update the forum with any lessons from the review. 

VOC Content "Zero" and still requires TVOC Emissions Compliance?

NC-v4 EQc2: Low-emitting materials
posted by Srinivasan M on Jul 30, 2021, 1:15 am

Hello Everyone, 

If a product VOC test certificate confirms the...

Last reply: Afogreen Build, Sep 13, 2021, 8:49 pm

Energy Star Protfolio Manager

EBOM-v4 EAp2: Minimum Energy Performance
posted by Sarfaraj Khan on Apr 11, 2017, 7:13 am

Hi

Can international project (UAE) attempting LEED V4 O&M can used Energy Star Protfolio Manager

Regards

Last reply: Trista Brown, Sep 7, 2021, 6:08 pm

Monthly Evapotranspiration Rate

NC-v4 WEp1: Outdoor water use reduction
posted by Ahmed Labeeb on Apr 9, 2018, 3:02 am

Dear,

We are working on a project in Dubai and the Client is asking to use the LEED Calculator instead of WaterSense tool. Now, no reference states the monthly evaporanpiration rate for...

Last reply: Afogreen Build, Jun 25, 2021, 9:37 am

Can we certify only the administrative building in a pharmaceutical factory project?

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Amgad Khattab on Jun 22, 2021, 11:43 am

We have a pharmaceutical factory project consists of the following buildings: -
1. An administrative building (Ground + 3). 
2. A Production building (Ground +2).
3. A Warehouse...

Last reply: Dave Hubka, Jun 24, 2021, 9:58 pm

Pre-selected sites, can a project still opt for Integrative Process credit?

NC-v4 IPc1: Integrative process
posted by Nermin Hegazy on Jun 20, 2021, 8:50 am

We are studying the feasibility of acheiving LEED certification for a series of floors in an office building.

Can the proejct still acheive the Integrative process credit even if the sites...

Last reply: Bipin Karki, Jun 23, 2021, 12:40 pm