Topic | Recent |
---|---|
GREY WATER USADGENC-v4.1 WEp2: Indoor water use reductionposted by FRAN HERRERA on Nov 8, 2021, 3:17 am
Hi dear mates, I need to add grey water usadge to Indoor water use reduction credit. According to my calculation 100 % of the WC flush water would be reused from showerhead and sinks. ... Last reply: emily reese moody, Nov 18, 2021, 1:07 pm |
|
Roadways materialsNC-v4 SSc4: Rainwater managementposted by Dina El-Sady on Nov 2, 2021, 11:22 am
Which would be better for this credit , a normal porous asphalt paving or a vegetated interlock ? Last reply: Gustavo De las Heras Izquierdo, Nov 3, 2021, 1:28 am |
|
Path 1. Divert 50% and Two Material Streams (1 point)NC-v4 MRc5: Construction and demolition waste managementposted by Ayman Khulief on Apr 29, 2021, 4:40 am
Hello! I represent a Solid Waste Management company often subcontracted to divert wastes from LEED projects. I have a silly question regarding Option 1. Diversion (1–2 points)... Last reply: Susan Di Giulio, Oct 25, 2021, 2:04 pm |
|
Free fresh air provided to small roomsNC-v4 EQp1: Minimum indoor air quality performanceposted by Dina El-Sady on Oct 24, 2021, 7:49 am
I am working on a project with many small buildings connected to each other , some of the very small rooms may be designed with free fresh air entering through fresh air grilles not fans , is... Last reply: Iqbal Khalilullah, Oct 25, 2021, 10:08 am |
|
Local Food ProductionPilot-Credits SSpc82: Local food productionposted by Elcin Korukluoglu on Sep 15, 2021, 2:56 pm
We're pursuing this credit along with our textile factory project at Turkey. We submitted for our final review, I will update the forum with any lessons from the review. |
|
VOC Content "Zero" and still requires TVOC Emissions Compliance?NC-v4 EQc2: Low-emitting materialsposted by Srinivasan M on Jul 30, 2021, 1:15 am
Hello Everyone, If a product VOC test certificate confirms the... Last reply: Afogreen Build, Sep 13, 2021, 8:49 pm |
|
Energy Star Protfolio ManagerEBOM-v4 EAp2: Minimum Energy Performanceposted by Sarfaraj Khan on Apr 11, 2017, 7:13 am
Hi Can international project (UAE) attempting LEED V4 O&M can used Energy Star Protfolio Manager Regards Last reply: Trista Brown, Sep 7, 2021, 6:08 pm |
|
Monthly Evapotranspiration RateNC-v4 WEp1: Outdoor water use reductionposted by Ahmed Labeeb on Apr 9, 2018, 3:02 am
Dear, We are working on a project in Dubai and the Client is asking to use the LEED Calculator instead of WaterSense tool. Now, no reference states the monthly evaporanpiration rate for... Last reply: Afogreen Build, Jun 25, 2021, 9:37 am |
|
Can we certify only the administrative building in a pharmaceutical factory project?NC-v4 MPR2: Must use reasonable LEED boundariesposted by Amgad Khattab on Jun 22, 2021, 11:43 am
We have a pharmaceutical factory project consists of the following buildings: - Last reply: Dave Hubka, Jun 24, 2021, 9:58 pm |
|
Pre-selected sites, can a project still opt for Integrative Process credit?NC-v4 IPc1: Integrative processposted by Nermin Hegazy on Jun 20, 2021, 8:50 am
We are studying the feasibility of acheiving LEED certification for a series of floors in an office building. Can the proejct still acheive the Integrative process credit even if the sites... Last reply: Bipin Karki, Jun 23, 2021, 12:40 pm |