Interior or Exterior Lighting fixture in residential projectNC-2009 EAp2: Minimum Energy Performanceposted by VICTOR MORENO on Jun 2, 2015, 10:37 am
We are developing a building energy modeling of a residential building based on 90.1-2007. The dwelling units have exterior areas (balconies) that have luminaires. These luminaires... Last reply: VICTOR MORENO, Jun 2, 2015, 10:45 am |
|
Atrium entrancesNC-2009 EAp2: Minimum Energy Performanceposted by Chilufya Lombe on Mar 5, 2015, 5:21 am
Hi, we have a large, naturally ventilated atrium in the middle of our building. All entrances to the building are via this enclosed atrium. My understanding is that the vestibule requirement is... Last reply: Marcus Sheffer, May 29, 2015, 10:25 am |
|
Task lights in college dormNC-2009 EAp2: Minimum Energy Performanceposted by Kathryn West on May 28, 2015, 10:39 am
Is this correct: If students bring their own task lights (and we don't know what they'd bring) we do not include them in our lighting power... Last reply: Kathryn West, May 28, 2015, 11:46 am |
|
Exterior Lighting Baseline vs ProposedNC-2009 EAp2: Minimum Energy Performanceposted by Maria Unruh on May 26, 2015, 3:35 pm
I'm trying to understand baseline exterior lighting versus the proposed. My calculations show that my proposed is less than my baseline, is this okay? What is USGBC looking for when they ask for... Last reply: Marcus Sheffer, May 26, 2015, 3:42 pm |
|
Baseline HVAC system choiceNC-2009 EAp2: Minimum Energy Performanceposted by Jatuwat Varodompun on May 25, 2015, 8:20 pm
Let's Say this building is 26,000 sf which the baseline is system 5-6. What if the exception area is 10,000 sf (process load difference >10... Last reply: Marcus Sheffer, May 26, 2015, 11:02 am |
|
G3.1.1 Exception for system 3NC-2009 EAp2: Minimum Energy Performanceposted by Haojie Wang on May 15, 2015, 11:48 am
We have a college building with around 50% of its floor area being a gym, which is sized to its maximum capacity during graduation. This would make it have significantly different load, more than... Last reply: Marcus Sheffer, May 26, 2015, 9:51 am |
|
Chiller IPLVNC-2009 EAp2: Minimum Energy Performanceposted by Rathnashree Bharadwaj on May 22, 2015, 2:58 am
I have a query on ASHRAE 90.1 2010. There are 2 paths to specify the chiller COP. How do we enter the part load values in the simulation software? ASHRAE only mentions the IPLV. Last reply: Rathnashree Bharadwaj, May 25, 2015, 2:24 am |
|
Where do I upload the response report for Design Final Package?NC-2009 EAp2: Minimum Energy Performanceposted by Matt Dem on May 21, 2015, 7:09 pmMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up May 22, 2015- 9:34 am Answered in this forum- http://www.leeduser.com/topic/leed-reviews-leed-online-appeals-designcon... Log in or register to post comments ... Last reply: Marcus Sheffer, May 22, 2015, 9:34 am |
|
Can I defer any ID credit to submit it w/ construction package?NC-2009 EAp2: Minimum Energy Performanceposted by Matt Dem on May 21, 2015, 7:08 pmMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up May 22, 2015- 9:33 am Answered in this forum- http://www.leeduser.com/topic/leed-reviews-leed-online-appeals-designcon... Log in or register to post comments ... Last reply: Marcus Sheffer, May 22, 2015, 9:33 am |
|
Building Area Method & Space-by-Space MethodNC-2009 EAp2: Minimum Energy Performanceposted by VICTOR MORENO on May 18, 2015, 7:46 am
Hello. I would like to use... Last reply: VICTOR MORENO, May 18, 2015, 9:53 am |