Basement lobbiesNC-2009 IEQp1: Minimum indoor air quality performanceposted by Marni Punt on Apr 14, 2015, 4:48 am
We have a project with 3 lobbies located in basement parking. The lobbies are not regularly occupied spaces, but are circulation spaces connecting to the main reception and lobby on the Ground... Last reply: Andrey Kuznetsov, Apr 29, 2023, 4:07 pm |
|
Vestibules- CIR 10426- InterpretationNC-2009 EAp2: Minimum Energy Performanceposted by André Harms on Jul 1, 2016, 9:25 am
The... Last reply: Julio Fernandez Amodia, Mar 14, 2023, 4:51 pm |
|
2019 GreenTag Product Health Declaration (PhD)EBOM-v4 EQp3: Green Cleaning Policyposted by Jutta Berns on Jul 28, 2020, 3:44 am
I came across a 2019 press release by Global GreenTag advising that the Global GreenTag PhD, Materials Transparency Certification Program is as of 2019 recognised by LEED and USGBC. Please can... Last reply: Trista Brown, Dec 22, 2020, 7:57 pm |
|
Steel- Default of 25% post-consumer contentNC-v4.1 MRc3: Sourcing of Raw Materialsposted by Jutta Berns on Nov 4, 2020, 7:41 am
If someone could please confirm whether the following guidance from the LEED v4 Reference Guide is still applicable to LEED v4.1 projects: "Default... Last reply: Bipin Karki, Nov 4, 2020, 8:00 pm |
|
Bench marking for Option 2.EBOM-v4 WEp1: Indoor water use reductionposted by Tiffany de Klerk on Apr 12, 2018, 2:53 am
Hi, I am quite confused as to how to calculate compliance for Option 2 Metered Water Use. We have the consumption data for 12 months for a building however the calculator is only for Option 1.... Last reply: Shakir Ismail, Jul 4, 2018, 3:18 pm |
|
Flush Out for "During Occupancy" Case of a Major Renovation projNC-v4 EQc4: Indoor air quality assessmentposted by Shabari Shaily Gerber on Sep 19, 2016, 9:15 am
Our project is an office building undergoing major renovation. The building will remain operational while the renovation is ongoing. The building occupancy will be phased to move the employees... Last reply: Shabari Shaily Gerber, Apr 24, 2018, 5:14 am |
|
ASHRAE 90.1:2010- Manual or Partial Auto to 50%NC-v4 EAp2: Minimum Energy Performanceposted by André Harms on Sep 11, 2017, 10:47 am
The requirement states that “Any automatic control device required … shall either be manual on or shall be controlled to automatically turn the lighting on to not more than 50% power” ... Last reply: Marcus Sheffer, Sep 12, 2017, 11:53 am |
|
Practical implementation of ASHRAE mandatory lighting controlsNC-v4 EAp2: Minimum Energy Performanceposted by André Harms on Aug 29, 2017, 11:22 am
As we are outside of the USA, ASHRAE 90.1:2010 is a new requirement that came with v4 and our designers have no experience in interpreting and applying the mandatory requirements. Can you... |
|
Motor efficiency in 50Hz countriesNC-v4 EAp2: Minimum Energy Performanceposted by André Harms on Feb 21, 2017, 8:13 am
In response to the ASHRAE 90.1:2007 mandatory requirements for the efficiency of 60Hz motors, some had used the European IE2 standard for 50Hz motors and demonstrated equivalency. The ASHRAE 90.... Last reply: Marcus Sheffer, Feb 21, 2017, 8:44 am |
|
Commissioning required for a CHP?NC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by André Harms on Jun 8, 2016, 10:02 am
One of our factory projects is planning on installing a... Last reply: Scott Bowman, Jun 10, 2016, 11:37 am |