Forum » NC-v4.1 LTc8
Topic

Electric Vehicles Option 1 requirements

NC-v4.1 LTc8: Electric Vehicles
posted by Olivera Nikolic on Jun 13, 2022, 8:24 pm

Could you please advise if the below interpretation of LTc8 credit/ Option 1 is correct:

The building has a total parking capacity of 500 spaces. The project team decides to install EVSE...

Are all project parking spaces to be included in the count for an Addition, or just the new spaces designed for the Addition?

NC-v4.1 LTc8: Electric Vehicles
posted by Andi Foster on Mar 23, 2022, 8:48 pm

We have a project with a 4-story horizontal addition being added (it is actually a healthcare facility, but there are not currently any Q/A's in the HC Forum).  Being helathcare, there is a large...

Last reply: emily reese moody, Apr 12, 2022, 12:34 pm

electric vehicles and reduced parking footprint?

NC-v4.1 LTc8: Electric Vehicles
posted by Craig Flandermeyer on Feb 7, 2022, 5:57 pm

Is there a way in v4.1 to use these two credits in tandem?  V4 has some guidance that increases percentages if both are used.  Curious if anyone has attempted both. Electric vehicles requires...

Last reply: emily reese moody, Mar 23, 2022, 1:53 pm

Project with no parking

NC-v4.1 LTc8: Electric Vehicles
posted by Summer Gorder on Feb 27, 2022, 11:06 pm

Can you still earn this credit with a project with no parking?

Last reply: David Hubka, Feb 28, 2022, 8:33 am

Electric Vehicle-required project documentation

NC-v4.1 LTc8: Electric Vehicles
posted by Michelle DeLora on Jan 18, 2022, 12:13 pm

I have a client asking me about Option 2 - which is ESVE ready for 10% of parking. In the online summary of the credit it does not go into the required uploads. I have been bitten in the past on...

Last reply: Mercedes Byers, Feb 14, 2022, 2:21 pm

Signage for EV spaces

NC-v4.1 LTc8: Electric Vehicles
posted by Amanda Polematidis on Dec 6, 2021, 12:34 pm

For those of you who completed the credit, would one sign for an area with EV charging stations suffice, or does each charging station need a sign?

Last reply: Emily Purcell, Dec 6, 2021, 1:08 pm

Option 1: 2% or 5%, Option 2: 6% or 10%?

NC-v4.1 LTc8: Electric Vehicles
posted by Timothy Ian Middleton on Sep 24, 2021, 5:46 am

Thanks to LEED User I just discovered the latest version of NC4.1_LTc8 requires 5% of spaces to comply with Electric Vehicle Charging Requirements, instead of 2%.

My LEED v4.1 Guide (which...

Last reply: emily reese moody, Sep 27, 2021, 2:56 am

Level 1 EV chargers- any credit for extensive installations vs a few Level 2's?

NC-v4.1 LTc8: Electric Vehicles
posted by Abhinay Sharma on Sep 16, 2021, 2:44 pm

Does anyone have any experience in getting credit for more Level 1 chargers?  Increasing having clients question whether Level 2 is the right approach for mass rollout due to electrical...

Last reply: Emily Purcell, Sep 17, 2021, 11:40 am

Existing EV Chargers Serving Project

NC-v4.1 LTc8: Electric Vehicles
posted by Kelli Kimura on Aug 18, 2021, 5:53 pm

Hi all,

Wondering if a project can take credit for existing EV charging stations that are located within the parking spaces used by a project (as long as they meet the EV charger...

Last reply: Nick Semon, Aug 19, 2021, 9:12 am

EV spaces for residential portion?

NC-v4.1 LTc8: Electric Vehicles
posted by MARLOES REININK on Jul 6, 2021, 10:38 am

We have a mixed-use project (office, hotel, & residential apartments). With this credit now specific to EV spaces only, how are the residential occupant spaces addressed? They are assigned...

Last reply: Emily Purcell, Jul 6, 2021, 12:12 pm