EV Charger has demand response capability but is not Energy StarNC-v4.1 LTc8: Electric Vehiclesposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Mar 7, 2023, 11:53 am
Hi All, To clarify language for this credit, does "Meet the connected functionality criteria for ENERGY STAR certified EVSE and be capable of responding to time-of-use market signals (... |
|
EVSE and ADA parking spacesNC-v4.1 LTc8: Electric Vehiclesposted by Bryna Dunn on May 24, 2019, 10:17 am
Has anyone submitted a project that includes ADA spaces in the spaces served by EVSE? For example, if a total of 3 charging stations are required on a project, and one of those is placed at an... Last reply: Bryna Dunn, Nov 10, 2022, 1:52 pm |
|
Preferred Parking for Electric VehiclesNC-v4.1 LTc8: Electric Vehiclesposted by Catherine Blakemore on Mar 24, 2020, 12:20 pm
Do the electric vehicle parking spaces need to be located within a certain distance of the building entrance? If yes, what is maximum allowable distance and is this distance a radial distance or... Last reply: Dave Hubka, Nov 7, 2022, 9:36 am |
|
Electric Vehicles Option 1 requirementsNC-v4.1 LTc8: Electric Vehiclesposted by Olivera Nikolic on Jun 13, 2022, 8:24 pm
Could you please advise if the below interpretation of LTc8 credit/ Option 1 is correct: The building has a total parking capacity of 500 spaces. The project team decides to install EVSE... |
|
Are all project parking spaces to be included in the count for an Addition, or just the new spaces designed for the Addition?NC-v4.1 LTc8: Electric Vehiclesposted by Mollie O'Rourke on Mar 23, 2022, 8:48 pm
We have a project with a 4-story horizontal addition being added (it is actually a healthcare facility, but there are not currently any Q/A's in the HC Forum). Being helathcare, there is a large... Last reply: emily reese moody, Apr 12, 2022, 12:34 pm |
|
electric vehicles and reduced parking footprint?NC-v4.1 LTc8: Electric Vehiclesposted by Craig Flandermeyer on Feb 7, 2022, 5:57 pm
Is there a way in v4.1 to use these two credits in tandem? V4 has some guidance that increases percentages if both are used. Curious if anyone has attempted both. Electric vehicles requires... Last reply: emily reese moody, Mar 23, 2022, 1:53 pm |
|
Project with no parkingNC-v4.1 LTc8: Electric Vehiclesposted by Summer Gorder on Feb 27, 2022, 11:06 pm
Can you still earn this credit with a project with no parking? Last reply: Dave Hubka, Feb 28, 2022, 8:33 am |
|
Electric Vehicle-required project documentationNC-v4.1 LTc8: Electric Vehiclesposted by Michelle DeLora on Jan 18, 2022, 12:13 pm
I have a client asking me about Option 2 - which is ESVE ready for 10% of parking. In the online summary of the credit it does not go into the required uploads. I have been bitten in the past on... Last reply: Mercedes Byers, Feb 14, 2022, 2:21 pm |
|
Signage for EV spacesNC-v4.1 LTc8: Electric Vehiclesposted by Amanda Polematidis on Dec 6, 2021, 12:34 pm
For those of you who completed the credit, would one sign for an area with EV charging stations suffice, or does each charging station need a sign? Last reply: Emily Purcell, Dec 6, 2021, 1:08 pm |
|
Option 1: 2% or 5%, Option 2: 6% or 10%?NC-v4.1 LTc8: Electric Vehiclesposted by Timothy Ian Middleton on Sep 24, 2021, 5:46 am
Thanks to LEED User I just discovered the latest version of NC4.1_LTc8 requires 5% of spaces to comply with Electric Vehicle Charging Requirements, instead of 2%. My LEED v4.1 Guide (which... Last reply: emily reese moody, Sep 27, 2021, 2:56 am |