Log in
Forum » NC-v4.1 LTc8
Topic

On-site EV required if only off-site parking provided?

NC-v4.1 LTc8: Electric Vehicles
posted by Rebecca Aarons-Sydnor on Sep 15, 2020, 7:52 am

The first line of the credit states the criteria as "Provide charging infrastructure for electric vehicles for on-site parking." However, under Option 1, it refers to "all parking spaces used by...

Last reply: David Hubka, Sep 15, 2020, 8:52 am

v4.1 Interpretation- Are spaces required to be "preferred"?

NC-v4.1 LTc8: Electric Vehicles
posted by Brian Salazar on Aug 31, 2020, 12:19 pm

Hello!  I asked this question under v4.1 Schools, but this side of the world seems better traveled.  

Do EV charging spaces (or infrastructure) for v4.1 (options 1 or 2) have to be in...

Last reply: Brian Salazar, Aug 31, 2020, 2:46 pm

EVSE 2%

NC-v4.1 LTc8: Electric Vehicles
posted by Andres Fernandez Alba on Apr 11, 2019, 1:49 pm

Hi Team,

Regarding..... Install electrical vehicle supply equipment (EVSE) in 2% of all parking spaces used by the project. Does this mean that each of the 2% parking...

Last reply: Brian Salazar, Aug 31, 2020, 12:15 pm

"in close proximity"

NC-v4.1 LTc8: Electric Vehicles
posted by emily reese moody on Jul 23, 2020, 3:37 pm

Anyone have any guesses as to what the acceptable proximity is to meet this portion of the requirements?

"The raceway shall originate at the main service or subpanel and shall...

Last reply: emily reese moody, Jul 29, 2020, 12:34 pm

EVSE and ADA parking spaces

NC-v4.1 LTc8: Electric Vehicles
posted by Bryna Dunn on May 24, 2019, 10:17 am

Has anyone submitted a project that includes ADA spaces in the spaces served by EVSE?  For example, if a total of 3 charging stations are required on a project, and one of those is placed at an...

Last reply: emily reese moody, Jul 29, 2020, 11:58 am

changes within v4.1 requirements

NC-v4.1 LTc8: Electric Vehicles
posted by emily reese moody on Jul 29, 2020, 11:15 am

Emily Purcell Green Building Specialist Solomon Cordwell Buenz LEEDuser Expert 140 thumbs up July 29, 2020- 11:36 am Discussed this earlier here:  https://leeduser.buildinggreen.com/forum/evse-iso-15118-compliance   Looking back, my last comment was abut the credit library not showing the newest requirement, but now it is consistent with the 1/2020 addenda. So I guess we can chalk that up to a credit iibrary redesign issue.  Log in or register to post comments emily reese moody Sustainability Director, Certifications & Compliance Jacobs LEEDuser Expert 230 thumbs up July 29, 2020- 11:55 am Ooh, thanks. Very...

Last reply: emily reese moody, Jul 29, 2020, 11:55 am

Infrastructure vs EVSE Install, can we get points for both for a total of 2 points?

NC-v4.1 LTc8: Electric Vehicles
posted by Derick Farfan on Jul 29, 2020, 8:38 am

Still learning...the way the credit is written it makes it appear that it is you go EITHER go for the Infrastructure Credit (6% or 6 spaces, whichever is greater) OR EVSE Install (2% or 2,...

Exemplary Performance for Electric Vehicles

NC-v4.1 LTc8: Electric Vehicles
posted by Michelle Lambert on Jun 2, 2020, 11:15 am

Is Exemplary Performance available for installing more electric vehicle charging stations than the required 2% in v4.1? It was not available under Green Vehicles in v4 but wondering if that has...

Last reply: Joseph Snider, Jun 3, 2020, 3:23 pm

Preferred Parking for Electric Vehicles

NC-v4.1 LTc8: Electric Vehicles
posted by Catherine Blakemore on Mar 24, 2020, 12:20 pm

Do the electric vehicle parking spaces need to be located within a certain distance of the building entrance?  If yes, what is maximum allowable distance and is this distance a radial distance or...

EVSE- ISO 15118 compliance

NC-v4.1 LTc8: Electric Vehicles
posted by Mike Cavanaugh on May 9, 2019, 6:30 pm

to get some clarification if a summary addenda document exists or not yet, and if so, where it is... If anybody on the Forum knows, let us know! Thanks! Log in or register to post comments Joseph Snider...

Last reply: Emily Purcell, Jan 29, 2020, 3:36 pm