Our project only has 5 parking spaces (all off street), and these are for employees only (FTE = 6), including one HC space.
The client would prefer to follow the "EV-Ready Infrstructure" pathway, but the minimum required spaces is 6.
Has anyone else had this situation? Even if they provide for 5 spaces, it seems excessive to require 100% of the spaces to be EV-ready.
We will run by USGBC as well -- just looking for some quick, preliminary feedback.