Smoke/acoustic seal around the door instead of weather sealCS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Yuko Murata on Jul 16, 2020, 12:35 am
Residential units in the project have doors facing the corridors which in completely inside of the building as they are in a high-rise tower. The guide says "Weather-strip all... Last reply: Kathy Wong, Jun 29, 2021, 2:33 am |
|
Design updates on an awarded prerequisiteCS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Sherif Ramzy on Oct 25, 2018, 8:04 am
Dear All, We are in the construction phase of a mall project that is registered to obtain LEED gold certification. The design review was received several months ago and the prerequisite of... Last reply: Sherif Ramzy, Oct 28, 2018, 12:13 pm |
|
single occupant offices as designated smoking rooms?CS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Christian Bösselmann on Sep 5, 2017, 3:32 pm
In a multi tenant CS office building smoking is prohibited in the entire building (Option 1). However the owner wishes to execute a few single person offices as designated smoking rooms. All... Last reply: Trista Brown, Oct 4, 2017, 8:07 pm |
|
ANSI/ASTM-E779 versionCS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by MARCIO OROFINO on Feb 23, 2017, 9:40 am
We have a project in Rio de Janeiro registered under CS and to which the fan door test shall be conducted since it is composed of three residential buildings. In Brazil, the test has not been... Last reply: Trista Brown, Aug 30, 2017, 5:20 pm |
|
Rooftop smoking areas?CS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Sara Neff on Nov 20, 2014, 10:27 pm
How is the 25' radius applied when the smoking area is on a rooftop? Do we assume the smoke drifts up or do I need to worry about windows below the smoking area? Last reply: Tristan Roberts, Aug 26, 2017, 6:59 pm |
|
Smoking areas in places of congregation or pedestrian trafficCS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Katherine Mariano on May 21, 2017, 11:38 pm
Hello, We are currently doing a Campus project registered under CS. We have submitted already for Mastersite preliminary review and received a comment regarding location of smoking areas... Last reply: Tristan Roberts, Aug 26, 2017, 6:55 pm |
|
Does a fresh air intake for a garage need to comply?CS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Ward Miller on May 10, 2016, 5:20 am
We have a project in which the location of the fresh air intake for the garage parking is proposed to be located Last reply: Ward Miller, May 13, 2016, 2:26 am |
|
Zero-lot line project- LEED requirementsCS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Mark Frey on Jun 11, 2015, 11:00 am
Hello, |
|
High Residential OptionsCS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Ran Zhang on Aug 29, 2010, 10:10 am
I am working on a high rise building with 22 stories. Is that eligible for choosing: Option 1- All Project - No Smoking in Buiding? Thanks. Last reply: Bassam Kadhiyar, Jan 31, 2015, 12:28 am |
|
Blower door test for 1 in 7 of each room modelCS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Nadia Ayala on Jun 4, 2014, 6:45 pm
Hi, I was wondering if the v2.2 option (HERS methodology) would still apply for v2009 in regards to the blower door test and number of units that must be tested. I read once that you could... Last reply: Sam Stoltze, Nov 10, 2014, 11:34 am |