Log in
Forum
Topic

Integrative Process Facilitator

LEED v4.1 Discussion Forum
posted by Edward Reifenstein on Mar 9, 2023, 6:39 pm

Nadav Malin CEO BuildingGreen, Inc. LEEDuser Moderator 844 thumbs up March 9, 2023- 8:02 pm Hi Edward, USGBC isn't specific about this but, in my experience, the facilitator can be either a member of the design team or someone engaged specifically to facilitate this process. You might also want to repost this question to the LEEDuser forum for that specific credit and see what the people there have to say. Good luck! Log in or register to post comments Dave Hubka Practice Leader- Sustainability EUA LEEDuser Expert 530 thumbs up March 11, 2023- 10:53 pm It is my opinion that an experienced LEED...

Last reply: Dave Hubka, Mar 11, 2023, 10:53 pm

Food Service Equipment

CI-v4 EAc5: Enhanced Refrigerant Management
posted by ESD Engineer on Mar 22, 2016, 5:30 pm

For a LEEDv4 CI project, does food service equipment such as ice cube machines, ice machines, and chiller freezers need to be documented?

Last reply: Dave Hubka, Mar 11, 2023, 10:50 pm

LEED O+M Campus Chiller Plant

EBOM-v4.1 EAp3: Energy Performance
posted by Rajarajan Sekar on Mar 11, 2023, 1:47 am

We are trying to go for LEED O+M  certification in one  of our buildings which has a Chiller plant in it along with other occupied places

Since we are measuring the building energy...

Advanced energy metering required for LEED when exempted by energy code?

Healthcare-v4 EAc3: Advanced Energy Metering
posted by Mark Benson on Mar 10, 2023, 5:59 pm

Our building is following ASHRAE 90.1-2016 for code compliance purposes.  Under section 8.4.3 Electrical Energy Monitoring, there is an exception for "Critical and Equipment branches or NEC...

Last reply: Marcus Sheffer, Mar 10, 2023, 7:37 pm

Fully Unconditioned Cold Dark Shell Envelope Requirements

CS-v4 EAp2: Minimum Energy Performance
posted by elvin ruya on Mar 10, 2023, 4:46 pm

Hi,

I was wondering if anyone has dealt with a LEED cold dark shell project in California before. For LEED mininum energy credit; can a building be completely unconditioned and walls and...

Last reply: Marcus Sheffer, Mar 10, 2023, 7:30 pm

INTERIOR LIGHTING IN OPEN OFFICES

CI-v4.1 EQc6: Interior lighting
posted by Amal Venugopal on Feb 1, 2023, 1:53 am

In LEED V4.1 Interior lighting credit,  Lighting control. The guide states that we have to "Provide dimmable or multilevel lighting for 90% of occupant spaces." Does it mean that in open office...

Last reply: Nadja Turek, Mar 9, 2023, 3:51 pm

Toilet stalls within locker rooms

Pilot-Credits WEpc147: All-Gender Restrooms
posted by Zeynep Cakir on Mar 9, 2023, 9:04 am

Hello everyone,

We have a multifamily residential building and on the ground floor there is a recreational area with sports facilities. I'd like to learn if we can exempt the toilet stalls...

Recertifying a leased building

LEED Rating System Selection
posted by Bill Potter on Mar 7, 2023, 11:25 am

Our company leases an office building where we are the sole tenants of the buidling. The project was originally certified as ID+C: Commercial Interiors, i belive by the Architecture firm when the...

Last reply: emily reese moody, Mar 8, 2023, 7:54 pm

Unregulated loads

CS-v4 EAp2: Minimum Energy Performance
posted by Julio Fernandez Amodia on Mar 8, 2023, 2:23 pm

Dear all,

I am currently assessing al the unregulated loads in a mall building. In this case there is a large type of spaces, such as restaurants, fitness center, spa, retail, department...

Last reply: Marcus Sheffer, Mar 8, 2023, 3:11 pm

BUG Method Clarificarion

NC-v4 SSc6: Light Pollution Reduction
posted by Mankisha Veng Veng on Mar 17, 2022, 10:56 am

the wall then this credit is not compatible. https://leeduser.buildinggreen.com/forum/government-mandated-fixtures-ex... Log in or register to post comments Aviv Nitzan LEEDuser Premium Member March 8, 2023-...

Last reply: Glenn Heinmiller, Mar 8, 2023, 12:47 pm