Topic | Recent |
---|---|
Integrative Process FacilitatorLEED v4.1 Discussion Forumposted by Edward Reifenstein on Mar 9, 2023, 6:39 pmNadav Malin CEO BuildingGreen, Inc. LEEDuser Moderator 844 thumbs up March 9, 2023- 8:02 pm Hi Edward, USGBC isn't specific about this but, in my experience, the facilitator can be either a member of the design team or someone engaged specifically to facilitate this process. You might also want to repost this question to the LEEDuser forum for that specific credit and see what the people there have to say. Good luck! Log in or register to post comments Dave Hubka Practice Leader- Sustainability EUA LEEDuser Expert 530 thumbs up March 11, 2023- 10:53 pm It is my opinion that an experienced LEED... Last reply: Dave Hubka, Mar 11, 2023, 10:53 pm |
|
Food Service EquipmentCI-v4 EAc5: Enhanced Refrigerant Managementposted by ESD Engineer on Mar 22, 2016, 5:30 pm
For a LEEDv4 CI project, does food service equipment such as ice cube machines, ice machines, and chiller freezers need to be documented? Last reply: Dave Hubka, Mar 11, 2023, 10:50 pm |
|
LEED O+M Campus Chiller PlantEBOM-v4.1 EAp3: Energy Performanceposted by Rajarajan Sekar on Mar 11, 2023, 1:47 am
We are trying to go for LEED O+M certification in one of our buildings which has a Chiller plant in it along with other occupied places Since we are measuring the building energy... |
|
Advanced energy metering required for LEED when exempted by energy code?Healthcare-v4 EAc3: Advanced Energy Meteringposted by Mark Benson on Mar 10, 2023, 5:59 pm
Our building is following ASHRAE 90.1-2016 for code compliance purposes. Under section 8.4.3 Electrical Energy Monitoring, there is an exception for "Critical and Equipment branches or NEC... Last reply: Marcus Sheffer, Mar 10, 2023, 7:37 pm |
|
Fully Unconditioned Cold Dark Shell Envelope RequirementsCS-v4 EAp2: Minimum Energy Performanceposted by elvin ruya on Mar 10, 2023, 4:46 pm
Hi, I was wondering if anyone has dealt with a LEED cold dark shell project in California before. For LEED mininum energy credit; can a building be completely unconditioned and walls and... Last reply: Marcus Sheffer, Mar 10, 2023, 7:30 pm |
|
INTERIOR LIGHTING IN OPEN OFFICESCI-v4.1 EQc6: Interior lightingposted by Amal Venugopal on Feb 1, 2023, 1:53 am
In LEED V4.1 Interior lighting credit, Lighting control. The guide states that we have to "Provide dimmable or multilevel lighting for 90% of occupant spaces." Does it mean that in open office... Last reply: Nadja Turek, Mar 9, 2023, 3:51 pm |
|
Toilet stalls within locker roomsPilot-Credits WEpc147: All-Gender Restroomsposted by Zeynep Cakir on Mar 9, 2023, 9:04 am
Hello everyone, We have a multifamily residential building and on the ground floor there is a recreational area with sports facilities. I'd like to learn if we can exempt the toilet stalls... |
|
Recertifying a leased buildingLEED Rating System Selectionposted by Bill Potter on Mar 7, 2023, 11:25 am
Our company leases an office building where we are the sole tenants of the buidling. The project was originally certified as ID+C: Commercial Interiors, i belive by the Architecture firm when the... Last reply: emily reese moody, Mar 8, 2023, 7:54 pm |
|
Unregulated loadsCS-v4 EAp2: Minimum Energy Performanceposted by Julio Fernandez Amodia on Mar 8, 2023, 2:23 pm
Dear all, I am currently assessing al the unregulated loads in a mall building. In this case there is a large type of spaces, such as restaurants, fitness center, spa, retail, department... Last reply: Marcus Sheffer, Mar 8, 2023, 3:11 pm |
|
BUG Method ClarificarionNC-v4 SSc6: Light Pollution Reductionposted by Mankisha Veng Veng on Mar 17, 2022, 10:56 amthe wall then this credit is not compatible. https://leeduser.buildinggreen.com/forum/government-mandated-fixtures-ex... Log in or register to post comments Aviv Nitzan LEEDuser Premium Member March 8, 2023-... Last reply: Glenn Heinmiller, Mar 8, 2023, 12:47 pm |