Topic | Recent |
---|---|
Roll out mats specifications?NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Victoria Rios Esteve on Nov 3, 2021, 1:13 pm
Hi everyone! On our project, we are placing rollout mats on the exterior but under roof hanging. Do you have any suggestion on brand/model/type we can get to achieve this credit? Any... Last reply: Afogreen Build, Dec 21, 2021, 6:04 pm |
|
Possibility of unconditioned regularly occupied spaceNC-v4 EAp2: Minimum Energy Performanceposted by Alessandro Zuanon on Dec 16, 2021, 6:46 am
Hello, i'm in the case of a regularly occupied space (a mechanical workshop in a warehouse), in which there is the possibility of no heating or cooling system installation. Is it possible... Last reply: Afogreen Build, Dec 21, 2021, 6:01 pm |
|
LEED rating for warehouseNC-v4 MPR2: Must use reasonable LEED boundariesposted by Alex Edwards on Dec 21, 2021, 10:17 am
Hi all, thanks for help! |
|
ASTM StandardHomes-v4 EQc7: Low-emitting productsposted by Safa Bari on Dec 20, 2021, 7:51 pm
If a sealant submittal has a... |
|
Designing with Nature- Wooden indoor vertical finishesPilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environmentposted by ANTONIO CERECEDA on Dec 9, 2021, 5:53 am
Currently we are working in a LEED project which we are pursuing this pilot credit of Designing with Nature, and we are wondering if natural ... Last reply: Afogreen Build, Dec 21, 2021, 7:24 am |
|
Short-term bicycle storageNC-v4.1 LTc6: Bicycle facilitiesposted by Maria Gamero on Dec 14, 2021, 10:04 am
Hi, In the office building where the occupants stay for 8 hours a day, is it necessary to have a short-term parking lot for bicycles? Or does it already work with the long-term parking?... Last reply: Afogreen Build, Dec 21, 2021, 7:23 am |
|
Is "rainwater collected" considered "reclaimed water"?NC-v4 WEc4: Water meteringposted by Sara BENLOUBA on Dec 20, 2021, 2:05 am
Is "rainwater collected" considered "reclaimed water", I am very... Last reply: Afogreen Build, Dec 21, 2021, 7:22 am |
|
Innovation Credits DocumentationNC-v4 INc1: Innovationposted by on Dec 16, 2021, 5:04 pm
May be a dumb question -- but how do I go about documenting innovation credits? In the innovation form it asks us to list the credit then provide documentation of it. Credits like Occupant... Last reply: Afogreen Build, Dec 21, 2021, 1:08 am |
|
LEED Boundary with roadWarehouses-NC-v4 MPR2: Must use reasonable LEED boundariesposted by Marine Cadier on Dec 19, 2021, 9:47 pm
The project is a warehouse with a ringroad being built around it. The problem is that a section of the road is outside of the boundary. How is it possible to integrate the road if there is land... Last reply: Afogreen Build, Dec 21, 2021, 12:57 am |
|
Baseline Lab SystemsNC-v4 EAp2: Minimum Energy Performanceposted by Cory Duggin on Dec 15, 2021, 12:22 pm
I got a comment on a project that said G3.1.1 exception c means that all qualifying lab spaces would be assigned to one system 5/7 for the whole building not one per floor. Is that correct? Last reply: Tyler Thumma, Dec 20, 2021, 8:28 am |