Topic | Recent |
---|---|
Radon Requirements for LEED v4- Residential/Dwelling UnitsNC-v4 EQp1: Minimum indoor air quality performanceposted by Chris Wilson on Feb 28, 2022, 3:43 pm
We are working on a five-story student dormitory including a partial basement area in EPA Radon Zone 1. Are we required to follow the guidance for 'residential only' projects in high-risk areas... |
|
Is Sustainable Forestry Initiative (SFI) a USGBC Equivalent to FSC woodNC-v4.1 MRc3: Sourcing of Raw Materialsposted by Summer Gorder on Feb 24, 2022, 2:23 pm
Has Sustainable Forestry Initiative (SFI) been approved as USGBC Equivalent to... Last reply: Heather DeGrella, Feb 28, 2022, 7:22 pm |
|
Habitat / endangered species rangeNC-v4 LTc2: Sensitive land protectionposted by Jorge Lopez de Obeso on Feb 28, 2022, 3:55 pm
I have made the corresponding search to corroborate that my project is not within a sensitive land. On the habitat point, I searched for information in "NatureServe" as indicated in the... |
|
Submeter on exterior hose bibsNC-v4 WEc4: Water meteringposted by Jason Garvens on Sep 12, 2018, 9:52 am
Is this credit's intent satisfied by having a second submeter serving a buildings exterior hose bibs (in addition to a... Last reply: Summer Minchew, Feb 28, 2022, 3:55 pm |
|
Manual controls- remote control deviceNC-v4 EQc6: Interior lightingposted by A&L SUSTENTABILIDADE on Feb 24, 2022, 8:04 am
The EQ credit Interior Lighting – Option 1 - Lighting Control states that “switches or manual controls must be located in the same space as the controlled luminaires. A person operating the... Last reply: Dave Hubka, Feb 25, 2022, 8:15 am |
|
Project with no parkingNC-v4.1 LTc8: Electric Vehiclesposted by Summer Gorder on Feb 27, 2022, 11:06 pm
Can you still earn this credit with a project with no parking? Last reply: Dave Hubka, Feb 28, 2022, 8:33 am |
|
Constant volume AHUs- Monitoring requirements AHU status On/OffNC-v4 EQp1: Minimum indoor air quality performanceposted by Alessandro Zuanon on Feb 23, 2022, 10:24 am
Dear all, i'm in the case of constant volume AHUs, the operating logic is ON/OFF. Regarding monitoring requirements for... Last reply: Alessandro Zuanon, Feb 28, 2022, 3:25 am |
|
VOC limts and basement parkingNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Devanand Ragbir on Feb 1, 2016, 9:24 am
Hi Last reply: Suzanne Roach, Feb 25, 2022, 2:29 pm |
|
EQ Overview: Warehouse Quality Views requirement?NC-v4 EQc8: Quality Viewsposted by Instra Ingenieros on Feb 23, 2022, 12:45 pm
According to LEED v4 EQ Overwiew " Table 2. Rating system–specific space classifications" Quality Views credit is compulsory to achieve the rest of the category for Warehouse & Distribution... Last reply: Deborah Lucking, Feb 25, 2022, 12:17 pm |
|
EV's owned by a Third-Party?NC-v4 LTc8: Green vehiclesposted by Randi B. on Feb 23, 2022, 9:16 pm
Given that all reference guide requirements are met concerning the actual equipment that is installed, is a project required to own and operate the EV chargers or could they work with a 3rd... Last reply: Dave Hubka, Feb 25, 2022, 8:11 am |