Log in
Forum
Topic

Radon Requirements for LEED v4- Residential/Dwelling Units

NC-v4 EQp1: Minimum indoor air quality performance
posted by Chris Wilson on Feb 28, 2022, 3:43 pm

We are working on a five-story student dormitory including a partial basement area in EPA Radon Zone 1.  Are we required to follow the guidance for 'residential only' projects in high-risk areas...

Is Sustainable Forestry Initiative (SFI) a USGBC Equivalent to FSC wood

NC-v4.1 MRc3: Sourcing of Raw Materials
posted by Summer Gorder on Feb 24, 2022, 2:23 pm

Has Sustainable Forestry Initiative (SFI) been approved as USGBC Equivalent to...

Last reply: Heather DeGrella, Feb 28, 2022, 7:22 pm

Habitat / endangered species range

NC-v4 LTc2: Sensitive land protection
posted by Jorge Lopez de Obeso on Feb 28, 2022, 3:55 pm

I have made the corresponding search to corroborate that my project is not within a sensitive land. On the habitat point, I searched for information in "NatureServe" as indicated in the...

Submeter on exterior hose bibs

NC-v4 WEc4: Water metering
posted by Jason Garvens on Sep 12, 2018, 9:52 am

Is this credit's intent satisfied by having a second submeter serving a buildings exterior hose bibs (in addition to a...

Last reply: Summer Minchew, Feb 28, 2022, 3:55 pm

Manual controls- remote control device

NC-v4 EQc6: Interior lighting
posted by A&L SUSTENTABILIDADE on Feb 24, 2022, 8:04 am

The EQ credit Interior Lighting – Option 1 - Lighting Control states that “switches or manual controls must be located in the same space as the controlled luminaires. A person operating the...

Last reply: Dave Hubka, Feb 25, 2022, 8:15 am

Project with no parking

NC-v4.1 LTc8: Electric Vehicles
posted by Summer Gorder on Feb 27, 2022, 11:06 pm

Can you still earn this credit with a project with no parking?

Last reply: Dave Hubka, Feb 28, 2022, 8:33 am

Constant volume AHUs- Monitoring requirements AHU status On/Off

NC-v4 EQp1: Minimum indoor air quality performance
posted by Alessandro Zuanon on Feb 23, 2022, 10:24 am

Dear all,

i'm in the case of constant volume AHUs, the operating logic is ON/OFF. Regarding monitoring requirements for...

Last reply: Alessandro Zuanon, Feb 28, 2022, 3:25 am

VOC limts and basement parking

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Devanand Ragbir on Feb 1, 2016, 9:24 am

Hi
My project has 2 level of basement parking with the standard vehicular access and egress ramp. Thre are also exhuast fans .
Does the...

Last reply: Suzanne Roach, Feb 25, 2022, 2:29 pm

EQ Overview: Warehouse Quality Views requirement?

NC-v4 EQc8: Quality Views
posted by Instra Ingenieros on Feb 23, 2022, 12:45 pm

According to LEED v4 EQ Overwiew " Table 2. Rating system–specific space classifications" Quality Views credit is compulsory to achieve the rest of the category for Warehouse & Distribution...

Last reply: Deborah Lucking, Feb 25, 2022, 12:17 pm

EV's owned by a Third-Party?

NC-v4 LTc8: Green vehicles
posted by Randi B. on Feb 23, 2022, 9:16 pm

Given that all reference guide requirements are met concerning the actual equipment that is installed, is a project required to own and operate the EV chargers or could they work with a 3rd...

Last reply: Dave Hubka, Feb 25, 2022, 8:11 am