Reduced Runoff/Rate of Runoff for existing site

NC-2009 SSc6.1: Stormwater design - quantity control
posted by R.L. Bowen on Jun 25, 2024, 11:03 am

Our premilimary review comments for V2009 noted that "Reduction in quantity (SSc6.1) will require stormwater to be infiltrates or re-used onsite. Detaining and releasing runoff...

First public comment draft of LEED v5 BD+C/ID+C: Energy and Atmosphere

LEED v5 BD+C/ID+C: Energy and Atmosphere Public Comments
posted by Nadav Malin on Apr 2, 2024, 1:52 pm

Share your comments on the first public comment draft of LEED v5 BD+C/ID+C: Energy and Atmosphere category on this forum. You can either reply to this thread or use the "Post a Question/Comment"...

Last reply: Mark Terpstra, Jun 24, 2024, 11:59 am

Hotels-Campus guidance or LEED Interpretation 10203

LEED Guidance for Campuses and Multiple Buildings
posted by Ana Milinkovic on Nov 23, 2021, 5:11 am

Hello,

I have a question regarding the approach for our project that wants to be LEEd certified. The project site consists of 9 buildings with similar use. In particula, the principal...

Last reply: Kath Williams, Jun 24, 2024, 10:48 am

Energy Star Rated Equivalent

LEED v4.1 Discussion Forum
posted by Roshan Pradhan on Jun 24, 2024, 5:34 am

Does TM-21 tested LED luminaire, with efficiency greater than 94% at 6000 hours meets the alternate equivalent criteria for Energy star rated products?

Telecommute Option in Arc Transportation Survey

EBOM-v4.1 LTp1: Transportation Performance
posted by on Sep 19, 2023, 4:03 pm

Hello all,

I am trying to figure out what is meant by and how to enter "route" data for telecommuters in the Arc transportation survey. It asks for miles(or km) traveled to the building....

Last reply: RICCARDO BALLESIO, Jun 24, 2024, 8:50 am

Appendix 2 default values

Calculating FTEs
posted by Julio Fernandez Amodia on May 11, 2023, 8:53 am

Dear all,

I am currently estimating the occupancy of a mall building. I have determined the occupancy following Appendix 2 default occupancies from LEED.

However, I am confused...

Last reply: Andrey Kuznetsov, Jun 23, 2024, 5:45 am

Purple Roof

NC-v4 SSc5: Heat Island Reduction
posted by Edgar Arevalo on Jun 20, 2024, 12:29 pm

Has anyone encountered a project where the client or other circumstances suggested we look into purple roof solution.  From the looks of it, it's a green roof solution with optimized stormwater...

Last reply: emily reese moody, Jun 23, 2024, 7:50 pm

Entryway system

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by RAMON CHRISTOPHER MEDRANO on Nov 17, 2021, 10:11 pm

I have a office space project, that will have an entryway system (walk off matt). My question is where is the accaptable way to install the walk of matt it should be 10-feet (3meters) inside the...

Last reply: Andrey Kuznetsov, Jun 23, 2024, 6:02 am

LEED ND Plan on Indoor Water Use Reduction

ND-Plan-v4 GIBp3: Indoor water use reduction
posted by Michael Wahjudi on Oct 30, 2020, 4:27 am

Hi all,

Under GIB Prerequisite: Indoor Water Use Reduction, as the concept plan might be limited on details on fixtures and fittings. Are we able to use letter of undertaking on maximum...

Last reply: Eliot Allen, Jun 22, 2024, 5:03 pm

Calculating FTEs and regularly occupied spaces: Auditorium

Calculating FTEs
posted by Carlos Bueno on Jun 18, 2024, 3:23 pm

Hello everyone,

I have a question: I need to calculate the FTEs and define the areas of regular occupancy for a convention center that includes office spaces and two event halls that could...