Log in
Forum
Topic

Exemplary Performance for CS

CS-v4.1 EAc5: Renewable energy
posted by Sofia Barahona on Jun 27, 2024, 1:40 pm

What it the percentage of...

Last reply: Sofia Barahona, Jun 28, 2024, 1:51 pm

Cancel Submit for Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Nathan Lee on Jan 16, 2013, 9:16 pm

Our project has hit a bit of a wall and need some guidance on updating credit forms after submitting for review.

The project is going for a split review and we prepared all the design...

Last reply: Nivedietha RajKumar, Jun 28, 2024, 11:29 am

Building Product Disclosure and Optimization required documentation

NC-v4.1 MRc4: Material Ingredients
posted by Marcelo Alencar Pereira on Jun 25, 2024, 2:28 pm

Do I need to submit the purchase invoice or any other documentation confirming product acquisition when applying for Building Product Disclosure and Optimization credits on LEED Online? If we don...

Last reply: Tommy Linstroth, Jun 28, 2024, 9:48 am

Option 2 IAQ Testing

NC-v4 EQc4: Indoor air quality assessment
posted by Robert Cashins on Nov 7, 2022, 12:18 pm

Are there guidelines on how to determine how many air samples need to be collected to comply with the...

Last reply: Bipin Karki, Jun 26, 2024, 4:49 pm

Are all spaces outside the 3x head height excluded?

NC-v4.1 EQc8: Quality Views
posted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on May 10, 2024, 9:17 am

I realize this is most likely quite a basic question, but in V4.1 are allowable quality view areas only for those regularly occupied spaces within the 3x head height zone and all others do not...

Last reply: Adam McCaughan, Jun 27, 2024, 12:23 pm

Pressurized entryway vestibules at high-volume building entrances

Healthcare-v4 EQc1: Enhanced indoor air quality strategies
posted by Priscillia Champagne on Feb 1, 2021, 8:26 am

Hi, I would like to know if there is additional guidance on the requirement to provide pressurized entryway vestibules at high-volume building entrances. Is there a standard to follow or specific...

Last reply: Kai Starn, Jun 27, 2024, 12:19 pm

Heat Island Reduction

NC-v4 SSc5: Heat Island Reduction
posted by Jose Castorena on Jun 27, 2024, 11:26 am

In this credit under option 1 the standard formula includes a vegetated roof.  If our client does not wish to pursue this feature due to perceived maintenance, can we still achieve this credit...

Last reply: Deborah Lucking, Jun 27, 2024, 12:05 pm

Flush-out option preferred, but some furniture delivery delayed

NC-v4 EQc4: Indoor air quality assessment
posted by Erica Downs on Aug 15, 2019, 11:58 am

The project contractor intends to do a full flush-out prior to occupancy.  Most of the furniture will be installed prior to flush-out, but on particular oder has been delayed and may not arrive...

Last reply: Russ Pellegrino, Jun 27, 2024, 11:48 am

Accessible Open Spaces

LEED v5 BD+C/ID+C: Sustainable Sites Public Comments
posted by Chantal Carius on May 18, 2024, 7:01 am

Think to have universal accessibility and open space is a big asset, and also to include green roofs and wetlands or ponds. I think it should also have a minimum or native or adapted plant...

Last reply: Thomas Lagarde, Jun 27, 2024, 11:12 am

Has anyone received feedback for Path 1- Develop a Standard Green Lease?

Pilot-Credits EApc159: Green Leases ACP
posted by Kristina K on Apr 21, 2023, 9:48 am
Last reply: Talia Fishman, Jun 26, 2024, 1:54 pm