Sheet membrane for waterproofing/crack isolationNC-v4.1 EQc2: Low-emitting materialsposted by Allen Cornett on Nov 1, 2022, 4:09 pm
Is sheet membrane waterproofing/crack isolation considered an underlayment that needs to be documented in the Low-Emitting Materials Flooring category? I have used troweled products that are... Last reply: Allen Cornett, Mar 25, 2023, 1:28 pm |
|
LEEDonline: uploading documents in master siteNC-v4 LTc6: Bicycle facilitiesposted by N. Josef Nassif on Mar 24, 2023, 5:58 am
Accroding to Guide Campus approach, it states the following: Eligible.” This credit may be documented once at the level of the master site, and then individual within the master site... |
|
Food and beberage tenant lease agreementCS-v4 EQp1: Minimum indoor air quality performanceposted by Julio Fernandez Amodia on Mar 20, 2023, 10:08 am
Hi to all, I am working on the LEED-CS certification for a shopping mall building with several restaurants and F&B spaces. It is unclear to me whether the ASHRAE 62.1 requirements... Last reply: Dave Hubka, Mar 24, 2023, 12:56 pm |
|
Vegetated buffer space qualifying as accessible space?NC-v4 SSc3: Open spaceposted by Chris Flint Chatto on Mar 23, 2023, 3:55 pm
How much of vegetation on either side of path can count as qualifying open space? it is clear from the credit that on site with a path through a garden, the entirety of the garden could qualify... Last reply: Dave Hubka, Mar 24, 2023, 7:46 am |
|
Social Equity within the Project TeamPilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Jonathan Weiss on Mar 23, 2023, 1:51 pm
Our project is using this pilot credit but the pathway about the project owner - who has done the hard work within their own JEDI process - has anyone successfully used that methodology to... |
|
LEED 2009 Core and Shell- Kitchen equipments modellingCS-2009 EAp2: Minimum Energy Performanceposted by Jerzy Wójcik on May 30, 2017, 9:50 am
Dear Marcus Our energy modeling technique for CS is... Last reply: Marcus Sheffer, Mar 22, 2023, 2:13 pm |
|
Need to clarify about energy simulationCI-v4 EAc2: Optimize Energy Performanceposted by Nagaraj Sankar on Jan 19, 2023, 10:29 pm
Hi all, Last reply: Marcus Sheffer, Mar 22, 2023, 2:05 pm |
|
TI Office Building Modeling Approach for Areas Outside of the LEED ScopeCI-v4 EAp2: Minimum Energy Performanceposted by elvin ruya on Mar 21, 2023, 11:50 am
Hi, The LEED scope of the TI project I have includes some spaces in 1st floor, whole 2nd, 16th and 17th floors. Is it required to model the whole building area even though it is outside of... Last reply: Marcus Sheffer, Mar 21, 2023, 3:06 pm |
|
Film installed in glazing partitionsCI-v4.1 EQc7: Daylightposted by Brightworks Sustainability on Mar 20, 2023, 6:58 pm
We're working on a project that will install a film on indoor glazing partitions for privacy purposes in meeting rooms and some private offices. 1) Do we have to include this film within... Last reply: Brightworks Sustainability, Mar 21, 2023, 1:55 pm |
|
Points for not having Cooling Tower- System 7- is it possible?CS-v4 WEc3: Cooling tower water useposted by Konstantina Kalliakoudi on Mar 21, 2023, 9:24 am
Hello to all, I have project CS which is nonresidential more than 5 Floors ( System 7 of ASHRAE 90.1- appendix G) and there will be NO cooling tower installed.
|