Log in
Forum
Topic

Sheet membrane for waterproofing/crack isolation

NC-v4.1 EQc2: Low-emitting materials
posted by Allen Cornett on Nov 1, 2022, 4:09 pm

Is sheet membrane waterproofing/crack isolation considered an underlayment that needs to be documented in the Low-Emitting Materials Flooring category?  I have used troweled products that are...

Last reply: Allen Cornett, Mar 25, 2023, 1:28 pm

LEEDonline: uploading documents in master site

NC-v4 LTc6: Bicycle facilities
posted by N. Josef Nassif on Mar 24, 2023, 5:58 am

Accroding to Guide Campus approach, it states the following: 

Eligible.” This credit may be documented once at the level of the master site, and then individual within the master site...

Food and beberage tenant lease agreement

CS-v4 EQp1: Minimum indoor air quality performance
posted by Julio Fernandez Amodia on Mar 20, 2023, 10:08 am

Hi to all,

I am working on the LEED-CS certification for a shopping mall building with several restaurants and F&B spaces. It is unclear to me whether the ASHRAE 62.1 requirements...

Last reply: Dave Hubka, Mar 24, 2023, 12:56 pm

Vegetated buffer space qualifying as accessible space?

NC-v4 SSc3: Open space
posted by Chris Flint Chatto on Mar 23, 2023, 3:55 pm

How much of vegetation on either side of path can count as qualifying open space?  it is clear from the credit that on site with a path through a garden, the entirety of the garden could qualify...

Last reply: Dave Hubka, Mar 24, 2023, 7:46 am

Social Equity within the Project Team

Pilot-Credits IPpc90: Social equity within the operations and maintenance staff
posted by Jonathan Weiss on Mar 23, 2023, 1:51 pm

Our project is using this pilot credit but the pathway about the project owner - who has done the hard work within their own JEDI process - has anyone successfully used that methodology to...

LEED 2009 Core and Shell- Kitchen equipments modelling

CS-2009 EAp2: Minimum Energy Performance
posted by Jerzy Wójcik on May 30, 2017, 9:50 am

Dear Marcus
I am writting to enquire about kitchen plugloads in CS. In one of our CS project client wants to include restaurant and kitchen.

Our energy modeling technique for CS is...

Last reply: Marcus Sheffer, Mar 22, 2023, 2:13 pm

Need to clarify about energy simulation

CI-v4 EAc2: Optimize Energy Performance
posted by Nagaraj Sankar on Jan 19, 2023, 10:29 pm

Hi all,
On one of our project having 8 floor that was
occupied under only with fourth storey which has undergone with system 8 for Energy simulation.
In this case, I need...

Last reply: Marcus Sheffer, Mar 22, 2023, 2:05 pm

TI Office Building Modeling Approach for Areas Outside of the LEED Scope

CI-v4 EAp2: Minimum Energy Performance
posted by elvin ruya on Mar 21, 2023, 11:50 am

Hi,

The LEED scope of the TI project I have includes some spaces in 1st floor, whole 2nd, 16th and 17th floors. Is it required to model the whole building area even though it is outside of...

Last reply: Marcus Sheffer, Mar 21, 2023, 3:06 pm

Film installed in glazing partitions

CI-v4.1 EQc7: Daylight
posted by Brightworks Sustainability on Mar 20, 2023, 6:58 pm

We're working on a project that will install a film on indoor glazing partitions for privacy purposes in meeting rooms and some private offices.

1) Do we have to include this film within...

Last reply: Brightworks Sustainability, Mar 21, 2023, 1:55 pm

Points for not having Cooling Tower- System 7- is it possible?

CS-v4 WEc3: Cooling tower water use
posted by Konstantina Kalliakoudi on Mar 21, 2023, 9:24 am

Hello to all,

I have project CS which is nonresidential more than 5 Floors ( System 7 of ASHRAE 90.1- appendix G) and there will be NO cooling tower installed.

  1. My project will...