Switch Optimize Process Water use V4.1CS-v4.1 WEc3: Optimize Process Water Useposted by Michaël Briffaz on Dec 12, 2022, 8:22 am
Hi Everyone, For a C&S project in LEED V4, I'm thinking to switch "Cooling Tower Water" in V4.1 "Optimize... |
|
CxA Experience ValidationCS-v4 EAc1: Enhanced Commissioningposted by Michaël Briffaz on Oct 19, 2022, 9:21 am
Hey, We would like to submit the experience and references for a... |
|
How does this apply for already constructed buildings and sites?Hospitality-NC-v4.1 SSc2: Protect or Restore Habitatposted by Dasaraden Mauree on Sep 13, 2022, 8:06 am
Hello all, We are currently working on a project which will undergo a complete renovation and the project is aiming to reach the LEED Platinum level. The project covers a whole... |
|
Ventilation of parking garagesCS-v4 EAp2: Minimum Energy Performanceposted by Sarah Leenknegt on Mar 11, 2019, 7:51 am
Hi We are modelling an office building in Switzerland with LEED v4 Core and Shell and have a question regarding the required ventilation rate for parking garages. According to ASHRAE 62.1... Last reply: Tyler Thumma, Aug 21, 2020, 11:38 am |
|
Tolerance within the achievement of criterias due to different affectationsNC-v4 MPR2: Must use reasonable LEED boundariesposted by Audrey LEDESERT on Jun 18, 2020, 4:37 amAudrey, this will be determined for each individual credit. I would suggest reviewing the credit language for the specific questions you have, and posting your questions to the specific LEEDuser forum for that credit. Log in or register to post comments 0 Vote up! ... Last reply: Tristan Roberts, Jul 21, 2020, 9:14 pm |
|
CxA: independance of the design teamNC-v4 EAc1: Enhanced Commissioningposted by Audrey LEDESERT on Jun 25, 2020, 5:08 am
In our office, we have 2 separate departments : one that works in building technicals (HVAC/San) and the 2nd that make consulting. The consulting department is in charge of LEED... Last reply: Marcus Sheffer, Jun 25, 2020, 9:06 am |
|
Outdoor ventilation rates in baseline and proposedCS-v4 EAp2: Minimum Energy Performanceposted by Sarah Leenknegt on Apr 7, 2020, 5:45 am
Hi Our situation is the following: the outdoor ventilation rates in the proposed building are higher than required by ASHRAE 62.1. Therefore, the baseline model will have lower outdoor... Last reply: Tyler Thumma, Apr 15, 2020, 1:13 pm |
|
Renewables outside LPB & owned by Project- Campus or no Campus?NC-v4 EAc5: Renewable energy productionposted by Anne Caminade on Dec 8, 2016, 6:50 am
Hi, We have a new small building on a large industrial site in Switzerland (same owner for the entire site) that we want to certify with LEED Gold (only the new small building) and we have no... Last reply: Marcus Sheffer, Dec 22, 2019, 4:51 pm |
|
Double skin facadeNC-v4 EAp2: Minimum Energy Performanceposted by Sarah Leenknegt on Mar 12, 2019, 3:48 am
Hi How do I model a naturally ventilated double skin facade in proposed and baseline building? - proposed building: as designed, with a thermal zone for the intermediate area. The... Last reply: Sarah Leenknegt, Mar 26, 2019, 3:21 am |
|
Additional requirements- Guarantees of Origin (GOs)NC-2009 EAc6: Green Powerposted by Jens Apel on Oct 6, 2016, 5:34 am
The European ACP for EAc6 states: Last reply: FABIO VIERO, Feb 19, 2018, 5:29 am |