Log in
Forum » Switzerland
Topic

Option 2: Priority Designation- local equivalent program

NC-v4 LTc3: High priority site
posted by N. Josef Nassif on May 16, 2023, 5:21 am

Dear Community

I hope you are doing fine.

I have a question regarding the Option 2 in high-Priority site. In LEED V4 it says: 

Locate the project on one of the following (one...

Last reply: N. Josef Nassif, Jul 6, 2023, 2:37 am

upload daylight calculation of seperate building in a Group for a Master Site

Warehouses-NC-v4 EQc7: Daylight
posted by N. Josef Nassif on Apr 26, 2023, 7:39 am

Dear Community 

I hope you are doing fine. 

We are doing a master site (office + Warehouse building + Techology Building) project where the two building (warehouse and technology)...

LEEDonline: uploading documents in master site

NC-v4 LTc6: Bicycle facilities
posted by N. Josef Nassif on Mar 24, 2023, 5:58 am

Accroding to Guide Campus approach, it states the following: 

Eligible.” This credit may be documented once at the level of the master site, and then individual within the master site...

Switch Optimize Process Water use V4.1

CS-v4.1 WEc3: Optimize Process Water Use
posted by Michaël Briffaz on Dec 12, 2022, 8:22 am

Hi Everyone,

For a C&S project in LEED V4, I'm thinking to switch "Cooling Tower Water" in V4.1 "Optimize...

Last reply: Marelle Davey, Mar 20, 2023, 12:38 pm

CxA Experience Validation

CS-v4 EAc1: Enhanced Commissioning
posted by Michaël Briffaz on Oct 19, 2022, 9:21 am

Hey,

We would like to submit the experience and references for a...

How does this apply for already constructed buildings and sites?

Hospitality-NC-v4.1 SSc2: Protect or Restore Habitat
posted by Dasaraden Mauree on Sep 13, 2022, 8:06 am

Hello all,

We are currently working on a project which will undergo a complete renovation and the project is aiming to reach the LEED Platinum level.

The project covers a whole...

Ventilation of parking garages

CS-v4 EAp2: Minimum Energy Performance
posted by Sarah Leenknegt on Mar 11, 2019, 7:51 am

Hi

We are modelling an office building in Switzerland with LEED v4 Core and Shell and have a question regarding the required ventilation rate for parking garages. According to ASHRAE 62.1...

Last reply: Tyler Thumma, Aug 21, 2020, 11:38 am

Tolerance within the achievement of criterias due to different affectations

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Audrey LEDESERT on Jun 18, 2020, 4:37 am

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11471 thumbs up July 21, 2020- 9:14 pm Audrey, this will be determined for each individual credit. I would suggest reviewing the credit language for the specific questions you have, and posting your questions to the specific LEEDuser forum for that credit. Log in or register to post comments ...

Last reply: Tristan Roberts, Jul 21, 2020, 9:14 pm

CxA: independance of the design team

NC-v4 EAc1: Enhanced Commissioning
posted by Audrey LEDESERT on Jun 25, 2020, 5:08 am

In our office, we have 2 separate departments : one that works in building technicals (HVAC/San) and the 2nd that make consulting.

The consulting department is in charge of LEED...

Last reply: Marcus Sheffer, Jun 25, 2020, 9:06 am

Outdoor ventilation rates in baseline and proposed

CS-v4 EAp2: Minimum Energy Performance
posted by Sarah Leenknegt on Apr 7, 2020, 5:45 am

Hi

Our situation is the following: the outdoor ventilation rates in the proposed building are higher than required by ASHRAE 62.1. Therefore, the baseline model will have lower outdoor...

Last reply: Tyler Thumma, Apr 15, 2020, 1:13 pm