Topic | Recent |
---|---|
Leak detection based on water meterPilot-Credits WEpc153: Water Leak Detection and Monitoringposted by Michaël Briffaz on Feb 5, 2024, 8:47 am
Hey, The credit languages is stating to "Install water sensors connected to a local network internet BMS or metering solution on water using subsystems." Would it be ok to... |
|
Indoor Water Use Reduction- Core and Shell: Binding tenant agreement only for a part of the buildingCS-v4 WEp2: Indoor water use reductionposted by Michaël Briffaz on Jan 24, 2024, 3:45 am
Hey, In a Core Shell buidling (offices and retail), the owner would like to earn point with the credit Indoor Water Use Reduction but the fixtures are not in his scope of work, it will be... Last reply: emily reese moody, Jan 25, 2024, 9:47 pm |
|
Option 2: Priority Designation- local equivalent programNC-v4 LTc3: High priority siteposted by N. Josef Nassif on May 16, 2023, 5:21 am
Dear Community I hope you are doing fine. I have a question regarding the Option 2 in high-Priority site. In LEED V4 it says: Locate the project on one of the following (one... Last reply: N. Josef Nassif, Jul 6, 2023, 2:37 am |
|
upload daylight calculation of seperate building in a Group for a Master SiteWarehouses-NC-v4 EQc7: Daylightposted by N. Josef Nassif on Apr 26, 2023, 7:39 am
Dear Community I hope you are doing fine. We are doing a master site (office + Warehouse building + Techology Building) project where the two building (warehouse and technology)... |
|
LEEDonline: uploading documents in master siteNC-v4 LTc6: Bicycle facilitiesposted by N. Josef Nassif on Mar 24, 2023, 5:58 am
Accroding to Guide Campus approach, it states the following: Eligible.” This credit may be documented once at the level of the master site, and then individual within the master site... |
|
Switch Optimize Process Water use V4.1CS-v4.1 WEc3: Optimize Process Water Useposted by Michaël Briffaz on Dec 12, 2022, 8:22 am
Hi Everyone, For a C&S project in LEED V4, I'm thinking to switch "Cooling Tower Water" in V4.1 "Optimize... Last reply: Marelle Davey, Mar 20, 2023, 12:38 pm |
|
CxA Experience ValidationCS-v4 EAc1: Enhanced Commissioningposted by Michaël Briffaz on Oct 19, 2022, 9:21 am
Hey, We would like to submit the experience and references for a... |
|
How does this apply for already constructed buildings and sites?Hospitality-NC-v4.1 SSc2: Protect or Restore Habitatposted by Dasaraden Mauree on Sep 13, 2022, 8:06 am
Hello all, We are currently working on a project which will undergo a complete renovation and the project is aiming to reach the LEED Platinum level. The project covers a whole... |
|
Ventilation of parking garagesCS-v4 EAp2: Minimum Energy Performanceposted by Sarah Leenknegt on Mar 11, 2019, 7:51 am
Hi We are modelling an office building in Switzerland with LEED v4 Core and Shell and have a question regarding the required ventilation rate for parking garages. According to ASHRAE 62.1... Last reply: Tyler Thumma, Aug 21, 2020, 11:38 am |
|
Tolerance within the achievement of criterias due to different affectationsNC-v4 MPR2: Must use reasonable LEED boundariesposted by Audrey LEDESERT on Jun 18, 2020, 4:37 amTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up July 21, 2020- 9:14 pm Audrey, this will be determined for each individual credit. I would suggest reviewing the credit language for the specific questions you have, and posting your questions to the specific LEEDuser forum for that credit. Log in or register to post comments ... Last reply: Tristan Roberts, Jul 21, 2020, 9:14 pm |