FAQs about EAp2 :

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

LEED 2009 Core and Shell - Kitchen equipments modelling

Dear Marcus I am writting to enquire about kitchen plugloads in CS. In one of our CS project client wants to include restaurant and kitchen. Our energy modeling technique for CS is that we assume a exemplary interrior design provided by a client where we set lightning (W/m2) calculated based on electric drawnings (or values contracted in leased agreement) and we set plugloads based on ASHRAE 90.1 Users Manual or values from previous projects. The problem here is the tenants kitchen where we have no idea how to model schedule or what W/m2 value should we use. How to deal with this problem? I look forward for Your help.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 05/30/2017 - 13:58

You can look at LEED Retail which establishes baseline values for kitchen equipment. You can also use the appendicies for COMNET which may provide W/sf values for kitchens and restaurants. https://comnet.org/

Wed, 03/22/2023 - 16:31

Hi, I am facing a similar problem. I am developing the energy model for a LEED CS certification and there are several food and beverage tenant spaces where the kitchen is not defined, not even the kitchen size. What could be a good approach for this case? can I assume a % of the kitchen area regarding the total food and beverage area? Thanks

Wed, 03/22/2023 - 18:13

For CS projects some credits require you to come up with a typical layout for future tenant spaces. You just need to be able to justify your estimation. So base it on some previous projects of a similar type.