Topic | Recent |
---|---|
Natural ventilation Parking garagesNC-v4 EQp1: Minimum indoor air quality performanceposted by Antonio Galicia on Jul 26, 2022, 5:11 pm
Hi everyone I'm working on an office building where is necessary to design natural ventilation for the parking zones. In order to achieve the ventilation requirements, it's enough to have... |
|
Common corridors in residential buildingNC-2009 EAp2: Minimum Energy Performanceposted by Panupant Phapant on Jul 14, 2016, 10:31 pm
Hi Marcus, My current project is a 40-story hotel building, which has 35 residential levels and 5 non-residential public-space levels. On the residential levels, the common corridors are... Last reply: Santiago Avila, Jul 26, 2022, 8:17 pm |
|
Bonus for hyper-local sourcingNC-v4.1 MRc3: Sourcing of Raw Materialsposted by Kim Shinn on May 23, 2019, 10:59 amfor that credit, either. Depending on the outcome of this discussion, I'll post something in the Forum for MRc4. Log in or register to post comments Summer Gorder Owner ecoREAL LEEDuser Premium Member 65 thumbs... Last reply: Gail Vittori, Jul 26, 2022, 3:32 pm |
|
Water Restoration Certificates Pilot CreditNC-v4 INc1: Innovationposted by Lissa Spitz on Sep 13, 2018, 10:50 am
Hi, can anyone confirm if the volume is supposed to be for the baseline or design annual water use? thanks! Last reply: Aliesa Adelman, Jul 26, 2022, 12:06 pm |
|
Choosing the correct rating systemData-Centers-NC-v4 MPR3: Must comply with project size requirementsposted by Dina El-Sady on Jul 26, 2022, 9:45 am
A data cebter building with the white area contributing to only 7% of the total BUA while the rest are offices, elec rooms , video rooms...etc , should it be treated as a data center rating... |
|
Indoor Air Quality AssessmentLEED v4.1 Discussion Forumposted by Theresa Scherwitz on Jul 26, 2022, 7:36 am
We were planning to achieve Option 2. Air Testing (2 points) for EQ Credit: Indoor Air Quality Assessment. There are fabric wrapped acoustic panels that will not be installed until after the... |
|
v4.1 Tier 1: Onsite Renewable PV InstallationNC-v4.1 EAc5: Renewable energyposted by Stephanie Graham on May 3, 2021, 1:22 am
The title of Table 1--"Points for Renewable Energy Procurement" is confusing, as it includes Tier 1. As you indicated under another comment in this credit, it is possible to procure onsite... Last reply: Stephanie Graham, Jul 25, 2022, 11:57 pm |
|
Grounwater contamination at the campus levelNC-v4 LTc3: High priority siteposted by Bret Mantyk on Jul 12, 2022, 12:03 pm
I'm working on a project that is considering pursing the LTc3 High Priority Site credit, Option 3... Last reply: Dave Hubka, Jul 25, 2022, 10:01 pm |
|
LEED 4.1: Is the exam based on the Beta version published on January 2019?LEED Exam Discussionposted by Ayman Raouf on Jul 14, 2022, 12:28 pm
Is the LEED AP exam based on the Beta version published on January 2019? Last reply: Paula Melton, Jul 25, 2022, 12:04 pm |
|
LEED v4 Interior Lighting Quality Option 2- Strategy CNC-v4 EQc6: Interior lightingposted by Ciaran McCabe on Dec 5, 2018, 2:34 pm
LEED v4 Interior Lighting Quality Option 2 - Strategy C When L70 information is not available for LEDs can other rated life values (such as L90 B10 @ 50,000 Hours or the... Last reply: Edgar Arevalo, Jul 25, 2022, 11:14 am |