Purchasing CalculatorEBOM-v4.1 MRc1: Purchasingposted by Alejandro Cobos on Apr 25, 2022, 12:00 pm
Hello! I could only find a Purchasing calculator for LEED... Last reply: Kristina K, May 4, 2023, 2:24 pm |
|
Required documentationCI-v4 EAc6: Green power and carbon offsetsposted by Marie Miller on May 1, 2023, 9:02 pm
Hello! I was under the impression that if we have the contractual confirmation that 100% of energy is being purchased through a... Last reply: Marcus Sheffer, May 4, 2023, 10:20 am |
|
Site Assessment on an existing siteWarehouses-NC-v4 SSc1: Site assessmentposted by Sofia Barahona on Apr 20, 2023, 3:23 pm
We are currently working on a warehouse project that is an extention of an existing warehouse. While conducting the... Last reply: Sofia Barahona, May 3, 2023, 7:54 pm |
|
Calculations for demountable partitionsCI-v4 MRc2: Interiors life-cycle impact reductionposted by Marie Miller on May 3, 2023, 4:30 pm
I'm working on a TI project and we're trying to get the Design for Flexibility point. When calculating for this credit, do we use linear feet or square feet of the product? I'm guessing we... |
|
Occupancy in a hybrid work scenarioCalculating FTEsposted by Nadia Azzam on May 2, 2023, 4:42 pm
Hello, I am working on a project for an office where employees will be following a hybrid work schedule.I was curious to know if we need to count all employees for our occupancy... Last reply: Andres Schwarz, May 3, 2023, 3:20 pm |
|
Group approach- Minimum requirement complianceNC-v4 EAp2: Minimum Energy Performanceposted by Luis Andrade on May 2, 2023, 12:54 pm
Hello everyone! I am working on 2 buildings that are registered in one project following the group approach. We did not report the buildings seperatly on the MEPC in the first... Last reply: Marcus Sheffer, May 3, 2023, 11:45 am |
|
Process consumptionsWarehouses-EBOM-v4.1 EAp3: Energy Performanceposted by RICCARDO BALLESIO on May 3, 2023, 11:13 am
We are analysing the electrical energy consumption of our client. The building is a warehouse of approximately 10.000 sqm with 1000 sqm of offices. The building is provided with a photovoltaic... |
|
VentilationWarehouses-EBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by RICCARDO BALLESIO on May 3, 2023, 11:19 am
All office spaces are naturally ventilated. The minimum opening location and size requirements are satisfied for all offices, restroom and meeting rooms. In case we find some areas such as... |
|
Job Opening! Manager of High Performance and Sustainable ConstructionHelp Wanted: LEED-related Jobsposted by Susan Heinking on May 2, 2023, 1:42 pm
Looking to make a difference on the Construction side of the industry? Come join Pepper Construction! We are a midwest based... |
|
Theater lighting controlsNC-v4 EQc6: Interior lightingposted by Rafi Karim on May 1, 2023, 8:05 pm
Hi All, we are working on a higher education theater school project where the Theater/Performace spaces do not have lighitng control panel in the same space as the performance because the lights... Last reply: Douglas Flandro, May 2, 2023, 10:04 am |