Topic | Recent |
---|---|
Laboratory Spaces baseline system in warm climate and proposed building is electrified heatingNC-v4.1 EAp2: Minimum Energy Performanceposted by Russell Knudson on Sep 17, 2024, 5:08 pm
For a project within warm Climate Zones 0 to 3A, and that has a "metal shop" space that requires more than 15,000 CFM, is it a correct reading that the baseline system serving those spaces shall... Last reply: Marcus Sheffer, Sep 26, 2024, 11:51 am |
|
Credit for unregulated loadsCI-v4 EAp2: Minimum Energy Performanceposted by Jeremy L. on Sep 25, 2017, 1:43 pm
The credit states that we can "use the COMNET modeling guidelines and procedures to document measures that reduce unregulated loads". In early June, I found the guidelines on COMNET's website in... Last reply: Marcus Sheffer, Sep 26, 2024, 11:36 am |
|
Getting total material cost for the projectNC-2009 MRc4: Recycled Contentposted by Mike Stopka on Jul 9, 2015, 12:55 pm
Hello I am having a lot of trouble getting a total material cost from the contractor. Is there any good/easy/quick strategy to get this number? How is this typically calculated by the... Last reply: Faran Arshad Chohan, Sep 26, 2024, 3:50 am |
|
luminaire mounting and partially enclosed spacesNC-v4 SSc6: Light Pollution Reductionposted by Esteban Martinez on Sep 25, 2024, 5:32 pm
Hello, I am working on a 10-story office LZ2 project looking for... Last reply: Glenn Heinmiller, Sep 25, 2024, 5:51 pm |
|
Design for Indoor Air Quality and Infection ControlPilot-Credits INpc155: Design for Indoor Air Quality and Infection Controlposted by Rihab Joucht on Sep 25, 2024, 4:07 pm
Hello everyone! I'm pursuing this pilot credit for a LEED v4 NC warehouse building and office. Any tips to share ? |
|
Recommendations for developing a standard green leasePilot-Credits EApc159: Green Leases ACPposted by Sofia Z on Sep 25, 2024, 12:26 pm
Hello, our projects aim to develop a standard green lease to comply with Path 1 of the ACP. We would like to explore the different clauses that exist, but we are particularly interested in... |
|
LEED Online SubmissionPilot-Credits WEpc115: Whole Project Water Use Reductionposted by Katherine Tich on Jul 29, 2024, 10:42 am
We are finalizing our documentation for this ACP, and want to make sure we upload to the correct location. In others' experience, what documentation pathway has been approved? It is our... Last reply: Sofia Z, Sep 25, 2024, 12:21 pm |
|
Baseline Exhaust Energy Heat RecoveryCI-v4 EAc2: Optimize Energy Performanceposted by Ciaran McCabe on Sep 5, 2019, 12:30 pm
In ASHRAE 90.1 Table 6.5.6.1 - Exhaust Energy Recovery Requirement where they mention % Outdoor Air at Full Design Airflow Rate are they referring to the "minimum outdoor air" value ? The outdoor... Last reply: Tyler Thumma, Sep 25, 2024, 8:43 am |
|
Baseline system Exhaust Air Energy Recovery and Heating Supply air, Preheat coilNC-v4 EAp2: Minimum Energy Performanceposted by J.W. Shin on Nov 22, 2023, 3:01 am
Dear Collegue, I have some questions for Baseline model's System control The project has the baseline system (System-7... Last reply: Sanket Sabale, Sep 25, 2024, 4:57 am |
|
water leak detection pilot credit?CS-v4 WEp2: Indoor water use reductionposted by Sareet Benayahu on Apr 14, 2021, 2:47 amhttps://leeduser.buildinggreen.com/forums?f%5B0%5D=im_field_credits%3A60... Log in or register to post comments Julio Fernandez Amodia LEEDuser Premium Member 5 thumbs up September 25, 2024- 3:04 am Hi, I am also struggling to find a system or an example of how to meet... Last reply: Julio Fernandez Amodia, Sep 25, 2024, 3:04 am |