Topic | Recent |
---|---|
Baseline parking for a DATACENTERNC-v4 LTc7: Reduced parking footprintposted by Marion THIBAULT on Jun 23, 2020, 12:10 pm
Hi everyone, I'm working on a DATACENTER project, and I can't find the baseline parking capacity for this type of building. It is not included in the "TABLE 1 - Base Ratios for parking... Last reply: Gioia Connell, Oct 16, 2024, 12:34 pm |
|
Campus ApproachNC-v4 LTc7: Reduced parking footprintposted by Ricardo Sá on Sep 2, 2020, 12:46 pm
Dear All, 1) school building (GFA = 30.500 m2... Last reply: Jose Castorena, Oct 16, 2024, 10:39 am |
|
Naturally ventilated spaces or Alternative Compliance Paths- Europe ACP: Naturally Ventilated SpacesHospitality-NC-v4 EQp1: Minimum indoor air quality performanceposted by rebecca resta on Oct 16, 2024, 9:58 am
Hello everyone, I am working on a project in Italy for LEED BD+C V4 - Hospitality certification with a Campus Approach. The complex consists of six buildings, three of... |
|
Alternative Compliance Path (ACP)- Europe ACP OR Standard Option for Naturally Ventilated SpacesNC-v4 EQp1: Minimum indoor air quality performanceposted by rebecca resta on Oct 16, 2024, 10:07 am
Hello everyone, I am working on a project in Italy for LEED BD+C V4 - Hospitality certification with a Campus Approach. The complex consists of six buildings, three of which will have... |
|
Interior cross contamination prevention out of scope-CICI-v4 EQc1: Enhanced indoor air quality strategiesposted by Casey Cullen-Woods on Jul 16, 2019, 1:45 pm
I am working on a commercial interior fit out project that would like to pursue this credit. The... Last reply: Catherine Callaway, Oct 15, 2024, 11:59 am |
|
Request for Clarification- Pre-Consumer Recycled Content, LEED v4.0/v4.1NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by HMTX Industries on Oct 12, 2024, 1:15 pm
Greetings! Our company is currently in need of clarification as to whether manufacturing scraps qualify as pre-consumer... Last reply: Kimberly Lombardozzi, Oct 14, 2024, 9:03 am |
|
EDP documentsPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by David Dixon on Dec 28, 2016, 4:54 pm
working on documentation for the credit I am finding that the documentation in EDPs do not translate to the credit matrix and documenting is not smooth Last reply: Chloe Naese, Oct 13, 2024, 8:55 pm |
|
One Greenguard Certificate for the same product marketed by Multiple Companies?NC-v4.1 EQc2: Low-emitting materialsposted by Tiffany Beffel on Sep 19, 2024, 9:32 pm
Our project used Shaw 4151 LVT Universal Adhesive. Shaw Contract literature makes claim to a Greenguard Certificate that is for the same 4151 universal adhesive, however, the certificate... Last reply: Tiffany Beffel, Oct 12, 2024, 12:47 pm |
|
Integrative Analysis of Building MaterialsPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Chris Lombardo on Apr 13, 2021, 1:37 pm
The project team pursued this pilot using material data gathered for both BPDO credits. While some sections in the calculator are not applicable, the completed sections did provide clarity on the... Last reply: Tazrin Islam, Oct 11, 2024, 5:23 pm |
|
Overall Feedback on Pilot CreditPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Kavita Karmarkar on Mar 21, 2024, 5:32 pm
As our project is located in Northern CA, it is not diffidult to achieve this credit as there are many haulers with third-party certified diversion rates (RCI) in the area. They may not be lowest... Last reply: Michelle Rosenberger, Oct 11, 2024, 3:49 pm |