Topic | Recent |
---|---|
SMOKING SIGNAGE for EAp: Environmental Tobacco Smoke ControlEBOM-v4 EQp2: Environmental tobacco smoke controlposted by Ramon Christopher Medrano on Aug 3, 2023, 2:52 am
With regards to our LEED v4 O+M project (group approach). Our project team is on the process on the of finalizing “NO SMOKING SIGNAGE’S” for the project. We have an... |
|
Hybrid recoolerNC-v4 WEc3: Cooling tower water useposted by Florian Schmidtchen on Aug 8, 2017, 6:05 am
Dear all, Our MEP Engineer wants to implement a dual recooling system/the hybrid recooler of the series KAVH. For our building type and the location in Germany with strong temperature... Last reply: Stephani Carter, Aug 2, 2023, 6:09 pm |
|
PRIVATE SHUTTLE FOR A FACTORY LOCATED IN A UPCOMING INDUSTRIAL DEVELOPMENT WITH NON-EXISTANT PUBLIC TRANSPORTATIONNC-v4.1 LTc5: Access to quality transitposted by Amal Venugopal on Jul 27, 2022, 5:13 am
The BD+C, NC project we are applying for is a factory with manufacturing unit and office spaces, located in an developing industrial area with no mutimodel transportation facilities . The... Last reply: Umesh Atre, Aug 2, 2023, 4:16 pm |
|
Car show-Car Dealer projectLEED v4.1 Discussion Forumposted by Rezkar Abdulmajeed on Jul 29, 2023, 4:28 am
Hi, I have a car dealer project that aims for LEED Silver. I have never done a Car dealer, could anyone please send me a sample scorecard? Last reply: Umesh Atre, Aug 2, 2023, 4:14 pm |
|
NC Building with no cooling towerPilot-Credits WEpc94: No Cooling Towerposted by Paula Hernandez on Aug 2, 2023, 2:26 pm
Hi, I think that this is a very helpfull credit for all the buildings that does not have a cooling tower in their HVAC systems. Although water cooled chillers may be sometimes more... |
|
MR CREDITs ENVIRONMENTAL PRODUCT DECLARATIONS, SOURCING OF RAW MATERIALS, & Material Ingredients.LEED v4.1 Discussion Forumposted by Hana Travin on Jul 31, 2023, 9:40 pm
As more clients are requesting materials related credits to be achieved in Japan, I wanted to start a forum or hub for LEED project leaders in Japan who are trying to achieve these 3 credits in... |
|
CO2 Monitor OptionNC-v4.1 EQc1: Enhanced indoor air quality strategiesposted by Glen Boldt on Jul 27, 2023, 1:31 am
We are located in CA and many of our projects have airside economizers. Per code, a CO2 monitor is required in densly... Last reply: Glen Boldt, Jul 31, 2023, 9:06 pm |
|
CO2 Monitor without Densely Occupied SpacesNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Jesse Hunt on Aug 31, 2022, 2:48 pm
Does anyone know if you can achieve a point for CO2 monitors without any densely occupied spaces? We are thinking of... Last reply: Grace Heraly, Jul 31, 2023, 2:59 pm |
|
In what case we don't have to run a baseline model with all 4 rotationNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Jul 29, 2023, 1:54 pm
Hi , I am working on a LEED Data center model with majority of space as vault, now I know for an existing building we dont need to rotate but for a data center do we need to rotate as the... Last reply: Marcus Sheffer, Jul 31, 2023, 9:05 am |
|
Indoor Water Use Reduction- Occupancy clarificationNC-v4 WEp2: Indoor water use reductionposted by Subhashkumar A on Jul 26, 2023, 1:15 pm
The project building is a gym building (G+2). On the second floor, it has residential units for its employees. The employees who work in this gym building stay in these residential units. The gym... Last reply: Dave Hubka, Jul 31, 2023, 9:01 am |