Log in
Forum
Topic

Regarding ASHRAE 90.1 2013 Fan Power Calculator_Excel Sheet

NC-v4 EAp2: Minimum Energy Performance
posted by Anurag Ghosh on Dec 13, 2024, 2:52 am

Hello Everyone,

Can anyone share me the ASHRAE 90.1 2013 Fan Power Calculator excel sheet for baseline model. I am unable to find it anywhere.

Thanks in Advance

Last reply: Marcus Sheffer, Dec 13, 2024, 10:52 am

Additional minimum requirement

Data-Centers-NC-v4.1 EAp2: Minimum Energy Performance
posted by Luis Andrade on Dec 9, 2024, 9:40 am

Hi everyone,

We're performing a LEED V4.1 Datacentre certification. LEED V4 stated that in addition to all "regular" minimum requirements, the project should also achieve "(...) a minimum...

Last reply: Marcus Sheffer, Dec 13, 2024, 8:41 am

chilled water and hot water metering for expansions of an existing building

NC-v4 EAc3: Advanced Energy Metering
posted by Moses Chong on Dec 11, 2024, 2:40 pm

I'm working on a project that is an expansion of an existing building, primarily adding a few levels on top. The cooling and heating energy of the expansion exceeds 10% of total energy use so...

Last reply: Marcus Sheffer, Dec 13, 2024, 8:30 am

Hotel Composting Program

Pilot-Credits SSpc129: Comprehensive Composting
posted by Belén Valladares López on Jun 17, 2024, 5:20 am

We are going to implement a composting program in a hotel.

For this purpose, we will allocate adequate space to store organic waste that will be removed twice a week, according to the...

Last reply: Matthieu Kieken, Dec 12, 2024, 4:33 pm

LEED v4 Campus Approach – Certification Process for Individual Buildings Under a Master Site

LEED Guidance for Campuses and Multiple Buildings
posted by Keerthi Ratnayake on Dec 12, 2024, 6:53 am

Dear LEED User Community,

We are working on a project that consists of seven buildings. We plan to register the project as a master site under the LEED v4 Campus Approach, with each...

Sourcing of Raw Materials location requirements

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Jason Grant on Oct 4, 2016, 11:23 am

On May 7, 2014, Christine asked a question about how to meet Option 1 requirements related to reporting of "...

Last reply: Anna Okviana, Dec 12, 2024, 4:52 am

Energy Performance on Air Structured Dome

NC-v4.1 EAp2: Minimum Energy Performance
posted by Thomas Jangaard on Dec 11, 2024, 2:07 pm

Hello,

The majority of our project footprint is a permanent air supported dome sports facility and have not been able to find precedent of such projects earning certification.

We...

Autocase inputs slightly different than LEED Outputs

Pilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysis
posted by Jill Kurtz on Aug 7, 2022, 6:05 pm

We use the Autocase tool for this innovation credit and find some of the inputs they require are slightly different than how LEED outputs information. I thought it would be good for anyone else...

Last reply: Eunice Perez, Dec 11, 2024, 9:03 am

Guidance on Green Wall Irrigation Requirements

Data-Centers-NC-v4 WEc1: Outdoor water use reduction
posted by Venkatkrishnan Ashok on Dec 10, 2024, 11:58 am

Hello,

We are proposing a green wall for our project, which will require irrigation and must adhere to the guidelines outlined in Option 2 of this credit. However, we were unable to locate...

LEED v4 BD+C, EAc1 Enhanced Cx, Option 2. Envelope Cx: Can General Contractor contract for the BECx testing?

NC-v4 EAc1: Enhanced Commissioning
posted by Theresa Lehman on Dec 10, 2024, 9:46 am

Has anyone come across a scenario where the general contractor is required to contract for the functional testing of the building envelope...