Regarding ASHRAE 90.1 2013 Fan Power Calculator_Excel SheetNC-v4 EAp2: Minimum Energy Performanceposted by Anurag Ghosh on Dec 13, 2024, 2:52 am
Hello Everyone, Can anyone share me the ASHRAE 90.1 2013 Fan Power Calculator excel sheet for baseline model. I am unable to find it anywhere. Thanks in Advance Last reply: Marcus Sheffer, Dec 13, 2024, 10:52 am |
|
Additional minimum requirementData-Centers-NC-v4.1 EAp2: Minimum Energy Performanceposted by Luis Andrade on Dec 9, 2024, 9:40 am
Hi everyone, We're performing a LEED V4.1 Datacentre certification. LEED V4 stated that in addition to all "regular" minimum requirements, the project should also achieve "(...) a minimum... Last reply: Marcus Sheffer, Dec 13, 2024, 8:41 am |
|
chilled water and hot water metering for expansions of an existing buildingNC-v4 EAc3: Advanced Energy Meteringposted by Moses Chong on Dec 11, 2024, 2:40 pm
I'm working on a project that is an expansion of an existing building, primarily adding a few levels on top. The cooling and heating energy of the expansion exceeds 10% of total energy use so... Last reply: Marcus Sheffer, Dec 13, 2024, 8:30 am |
|
Hotel Composting ProgramPilot-Credits SSpc129: Comprehensive Compostingposted by Belén Valladares López on Jun 17, 2024, 5:20 am
We are going to implement a composting program in a hotel. For this purpose, we will allocate adequate space to store organic waste that will be removed twice a week, according to the... Last reply: Matthieu Kieken, Dec 12, 2024, 4:33 pm |
|
LEED v4 Campus Approach – Certification Process for Individual Buildings Under a Master SiteLEED Guidance for Campuses and Multiple Buildingsposted by Keerthi Ratnayake on Dec 12, 2024, 6:53 am
Dear LEED User Community, We are working on a project that consists of seven buildings. We plan to register the project as a master site under the LEED v4 Campus Approach, with each... |
|
Sourcing of Raw Materials location requirementsNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Jason Grant on Oct 4, 2016, 11:23 am
On May 7, 2014, Christine asked a question about how to meet Option 1 requirements related to reporting of "... Last reply: Anna Okviana, Dec 12, 2024, 4:52 am |
|
Energy Performance on Air Structured DomeNC-v4.1 EAp2: Minimum Energy Performanceposted by Thomas Jangaard on Dec 11, 2024, 2:07 pm
Hello, The majority of our project footprint is a permanent air supported dome sports facility and have not been able to find precedent of such projects earning certification. We... |
|
Autocase inputs slightly different than LEED OutputsPilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysisposted by Jill Kurtz on Aug 7, 2022, 6:05 pm
We use the Autocase tool for this innovation credit and find some of the inputs they require are slightly different than how LEED outputs information. I thought it would be good for anyone else... Last reply: Eunice Perez, Dec 11, 2024, 9:03 am |
|
Guidance on Green Wall Irrigation RequirementsData-Centers-NC-v4 WEc1: Outdoor water use reductionposted by Venkatkrishnan Ashok on Dec 10, 2024, 11:58 am
Hello, We are proposing a green wall for our project, which will require irrigation and must adhere to the guidelines outlined in Option 2 of this credit. However, we were unable to locate... |
|
LEED v4 BD+C, EAc1 Enhanced Cx, Option 2. Envelope Cx: Can General Contractor contract for the BECx testing?NC-v4 EAc1: Enhanced Commissioningposted by Theresa Lehman on Dec 10, 2024, 9:46 am
Has anyone come across a scenario where the general contractor is required to contract for the functional testing of the building envelope... Last reply: Dave Hubka, Dec 10, 2024, 10:57 am |