Log in
Forum
Topic

Should we track quantity and costs for profiles and caps/wall base moldings?

NC-v4.1 EQc2: Low-emitting materials
posted by Priscillia Champagne on Sep 12, 2023, 1:50 pm

I am wondering if edging profiles (like Schluter systems let's say) as well as wall base caps and moldings (like Tarkett finishing accessories) need to be tracked for the Flooring Category. In...

Last reply: Priscillia Champagne, Sep 13, 2023, 4:16 pm

Want to consider 30% fresh air in printing areas

CI-v4 EQp1: Minimum indoor air quality performance
posted by Nagaraj Sankar on Sep 10, 2023, 11:23 pm

Hi users,
One of office project having printing spaces in open office. It is in the name of repro. As per LEED Requirement, whether this space should be negatively pressurised or not....

Last reply: Nagaraj Sankar, Sep 13, 2023, 12:53 am

Pre-cast concrete structure environmental product declarations

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Maiz Rech on Sep 11, 2023, 2:17 pm

Considering the building is built of a precast concrete...

Which buildings/structures to consider while registering project

EBOM-v4.1 MPR2: Must use reasonable LEED boundaries
posted by Wafa Arif on Sep 11, 2023, 4:28 am

I have three office towers on one large property, each connected to a mall via walkways. The shared parking structures beneath these towers serve tenants, mall visitors, and others. My objective...

Basement carpark areas?

CS-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Scott McMillan on Jul 2, 2015, 11:54 pm

As noted above the requirement is applicable to "All adhesives and...

Last reply: Ahmed Ashraf Abdelfattah, Sep 11, 2023, 3:00 am

DES Owned by A Third Party

NC-v4 EAp4: Fundamental Refrigerant Management
posted by Candice Rogers on Sep 8, 2023, 12:03 pm

Hello -

We have a project pursuing certification that is served by a...

Last reply: Candice Rogers, Sep 9, 2023, 2:55 pm

Waste-to-Energy diversion

NC-v4.1 MRp2: Construction and demolition waste management
posted by Danielle Waters on Sep 7, 2023, 1:04 pm

In LEED v4,...

Last reply: Dave Hubka, Sep 7, 2023, 2:17 pm

Definitions for a lab/office building

NC-v4 LTc7: Reduced parking footprint
posted by Maiz Rech on Sep 7, 2023, 9:56 am

Hello!

I'm working on a lab/office building (3800 sq meters, 1 office floor and 2 lab floors). The building will be used only by the company that owns it, the lab and offices won't be...

TABLE 1. Default Occupancy Numbers

CS-v4 EQp1: Minimum indoor air quality performance
posted by Oscar Martinez on Sep 6, 2023, 12:05 am

Hi, I'm working on a warehouse project in Mexico. The rating system is v4 CS and I have a question in progress.

In the storage area, we are considering the table APPENDIX 2. DEFAULT...

Advanced metering for cooling and ventilation

NC-v4 EAc3: Advanced Energy Metering
posted by Dina El-Sady on Sep 6, 2023, 5:50 am

How can we separate metering for cooling an ventilation if they are both within the same unit ?

Last reply: Dave Hubka, Sep 6, 2023, 9:17 am