Log in

4026 search results for "zero lot line"

Forum
Topic

Urban Core vs. Urban?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Marine Petrosyan on Aug 29, 2023, 9:41 am

the Precertification form beforehand? Because it contains a lot of information, that is actually being clarified in the process. Log in or register to post comments Emily Purcell Sustainable Design Lead CannonDesign...

Last reply: Emily Purcell, Aug 29, 2023, 5:04 pm

Lighting Boundary modification- Railway track

NC-v4 SSc6: Light Pollution Reduction
posted by Lenka Matějíčková on Aug 24, 2023, 6:01 am

We have a major industrial development (car manufacturing plant) project. There is a railway track going along the north perimeter of the factory. In the LEED manual its being said that: When the property line is adjacent to a public street, alley, or transit corridor, the lighting boundary may be moved to the center line of that street, alley, or corridor. Since the railway is clearly a transit corridor, can this exemption be applied?  This topic has already been discused on this forum in 2017, without a clear conclusion (the key question was revolving around whether the railway track can...

Last reply: Lenka Matějíčková, Aug 25, 2023, 7:49 am

Future medical office building- views methodology

CS-v4.1 EQc5: Quality Views
posted by Jeremy Shiman on Aug 14, 2023, 10:45 am

We are pursuing the Quality Views credit on a CS project that was originally going to be the shell for a tech client, but will now be the shell for a MOB. We have tentative floor plan layouts for the MOB from the interior team, but MOB's have lots of interior rooms without access to daylight, similar to a hospital. As such, we certainly won't comply with the typical requirements. I'm wondering if anyone has pursued this credit in a similar situation and used the LEED for Healthcare guidelines for how to calculate Quality Views compliant area, rather than using the more general quality...

All Gender Restrooms- Extent of Hygiene Product Distribution

NC-v4 INc1: Innovation
posted by Summer Minchew on Apr 2, 2021, 10:56 am

restrooms.  Time spent in single stalls was more than double for conventional.  A line formed often throughout the day! Log in or register to post comments Michelle Bombeck Associate Principal O'Brien360...

Last reply: Graham Linn, Aug 7, 2023, 8:18 pm

Anyone been through full review of this credit yet?

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Joanna Switzer on Oct 26, 2017, 2:57 pm

products: 1) Dune ceiling panel (Armstrong), 2) LOXON Concrete & Masonry Primer (Sherwin Williams) and 3) ProMar 200 HP Zero VOC Eg-Shel (Sherwin Williams). Does the integrative analysis worksheet must...

Last reply: Mariia Savinska, Aug 4, 2023, 4:04 am

Integrative Process v4.1- Project Team Letter

NC-v4.1 IPc1: Integrative process
posted by Kelli Kimura on Jul 24, 2019, 3:09 pm

the energy systems and water analysis as an annex or just write a summary for it? Could you please let me know as I am also drafting this letter and would like to hear about your experience? Thanks a lot...

Last reply: Rezkar Abdulmajeed, Jul 31, 2023, 8:10 am

Acoustical Performance for NC Renovation project

NC-2009 IDc1: Innovation in Design
posted by Linda Davisson on Sep 8, 2010, 2:00 pm

Shannon Gray Consultant YRG sustainability LEEDuser Basic Member 228 thumbs up September 8, 2010- 4:08 pm That is a good question that is asked a lot. My guess would be that you would want to aim somewhere in between the two. The prerequisite addresses Reverberation Time and HVAC Background Noise, where the credit also addresses Sound Transmission from adjacent spaces. I would aim for addressing all three areas but would not necessarily hit the credit requirements. You should check out the Documentation Toolkit section of this credit on LU for an overview of how Armstrong earned and Acoustic ID...

Last reply: Rezkar Abdulmajeed, Jul 29, 2023, 4:25 am

Indoor Water Use Calculator malfunction

NC-v4 WEp2: Indoor water use reduction
posted by Susan Di Giulio on Jan 25, 2022, 3:03 pm

write that? Really unacceptable. Clients giving us and the program a whole lot of side-eye. Again and again, it feels like the USGBC just doesn't care about it's users. Log in or register...

Last reply: Gwenedd Murray, Jul 28, 2023, 6:03 pm

Default EIA rates for India

NC-v4 EAp2: Minimum Energy Performance
posted by Moses Chong on Jul 26, 2023, 5:43 pm

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up July 28, 2023- 10:02 am There is no requirement for using a published rate. Does the owner of the project own other buildings in the area? Or do you know others who pay the local utility rates? You can just figure out what the local rate is without getting it from the utility. Log in or register to post comments Moses Chong Mechanical Engineer WSP LEEDuser Basic Member 2 thumbs up July 28, 2023- 11:14 am Thanks for your reply. The project is confidential so a lot of information are not available. That's why...

Last reply: Moses Chong, Jul 28, 2023, 11:14 am

Off street parking and on street parking

NC-v4 LTc7: Reduced parking footprint
posted by Azaz Ansari on Nov 21, 2017, 8:03 pm

parking.  Best regard – Afogreen Build Team Log in or register to post comments Emma Loris LEEDuser Basic Member July 27, 2023- 2:42 am It's simple, mate! If a shopping mall has a large parking lot...

Last reply: Emma Loris, Jul 27, 2023, 2:42 am