Forum
Topic

LT credits for regional priority

NC-v4 LTc1: LEED for Neighborhood Development location
posted by Emily Purcell on Aug 12, 2020, 5:27 pm

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up August 14, 2020- 7:34 am Hi Emily, I agree with you that this is an area where your eligibility for RP credits is affected in a way that is probably non-intentional. Bottom line, I would ask GBCI if they can help. As you point out the LEED Online mechanism is automatic but they might have a workaround for this. To play devil's advocate, the argument I can see GBCI making is that LTc1 is a convenience credit that replaces more detailed documentation of other LT credits. Convenience doesn't come...

Last reply: Cindy Quinn, Apr 21, 2022, 9:28 pm

R32 Refrigerant Not in The LEED Form

CS-v4 EAc6: Enhanced Refrigerant Management
posted by Laura Nolan on Aug 19, 2020, 1:24 pm

depletion potential (ODP) of zero and a global warming potential (GWP) of less than 50, then this option should be fine too. Also, you may want to provide cut sheets/manufacturer's documentation showing...

Last reply: Bipin Karki, Dec 8, 2020, 8:11 am

grass does not count, so what exactly does "two types of vegetation" mean?

NC-v4.1 SSc3: Open space
posted by Sue Bryant on Sep 2, 2020, 6:26 pm

12:01 pm Received this comment that appears to be in line with these questions. "Turf grass has been included in the calculations as vegetated open space. Note that areas of turf may only be included...

Last reply: Craig Flandermeyer, May 12, 2021, 12:01 pm

LEED NC & Major Renovation, excluding parking garage

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by on Sep 25, 2020, 9:40 am

Hi,  I have a question regarding an existing building that will undergo a major renovation. There is a separate parking garage that is not connected to the building however it was included in the purchase of the lot. The parking garage had a fire a few years ago and is in need of renovation and large part of the garage is closed off due to it is deemed too unsafe for usage. The owner has plans to renovate the garage, however the renovations of the garage is not planned to be included in the scope of work for the major renovation of the main building. Is it possible for us to exclude the garage from...

Last reply: Ralph Bicknese, Sep 29, 2020, 11:00 am

"ready for review" status in Design Final Review Decision

CS-2009 IDc2: LEED Accredited Professional
posted by sofia la cognata on Nov 10, 2020, 6:17 am

Good Morning, we have submitted this credit in the design review, but in the Design Final Review Decision the status is "ready for review" and not "anticipated" like the others. Can you tell me why? Thanks a lot IDc2 Italy ...

Last reply: Gloria Rozzini, Oct 29, 2021, 11:00 am

Medical Office Building- Exam | Soiled/Clean Workroom | Mop Sinks- What fixture should these be listed as on the form?

NC-v4.1 WEc2: Indoor water use reduction
posted by Catherine Blakemore on Dec 18, 2020, 12:07 pm

as a typical group restroom. As long as all of your occupants have access, the % per line item should remain 100%. What will be different is the field at the top-ish, under the occupancy table, where you'll...

Last reply: emily reese moody, Feb 2, 2023, 12:13 pm

Mandatory to comply with ASHRAE 90.1 2010 Section 9.4.1 for Lighting Control?

CI-v4 EAp2: Minimum Energy Performance
posted by shashank gangil on Apr 19, 2021, 2:16 am

We recently received the review result of a LEED v4 Commercial Interior Project. The reviewer is asking for proof whether all mandatory requirements of section 9.4.1 for lighting control have been met?  From our earlier projects going for LEED V4 CI, we havent received any such comments. By simply reducing LPD and installating Daylight and Occupancy Sensors, we used to comply.  Now after checking ASHRAE 90.1 2010 Section 9.4.1 requirements, a lot of requirement might not be able to make.  What is the way forward here?  EAp2 ...

Last reply: Afogreen Build, Sep 13, 2021, 8:48 pm

Marking up EPDs

NC-v4.1 MRc2: Environmental Product Declarations
posted by Martha Norbeck on Jun 9, 2021, 3:51 pm

at delivering recycled/regional/VOC product data and EPDs/HPDs seem to be reaching that point now. But even if that weren't the case this level of review detail seems like a lot of effort for little gain...

Last reply: Emily Purcell, Dec 28, 2021, 6:03 pm

LEED v4.1 Daylight and Views calculator

NC-v4.1 EQc8: Quality Views
posted by Deborah Lucking on Jun 21, 2021, 7:10 pm

occupied space as two line items in the v4.1 calculator: one with the compliant and one with the non-compliant area, to account for portions of a regularly occupied space that does not have a quality view....

Last reply: Deborah Lucking, Oct 25, 2023, 1:05 pm

Hotels-Campus guidance or LEED Interpretation 10203

LEED Guidance for Campuses and Multiple Buildings
posted by Ana Milinkovic on Nov 23, 2021, 5:11 am

Andrey Kuznetsov ESG consultant, LEED AP BD+C Self Employed LEEDuser Basic Member 33 thumbs up May 11, 2024- 3:02 pm Not for you (since a lot of time passed) but for others with such question- yes, it's possible to certifiy all this buildings as one according to LEED interpretation 10203, but one must be sure that all requirements of this interpretation are met: 1. The buildings included in the LEED certification must be a part of the same identity. For example, the buildings are all part of the same elementary school and not a mix of elementary school and high school buildings together...

Last reply: Kath Williams, Jun 24, 2024, 10:48 am