Jan 1, 2019 change to SCAQMD Rule 1113 and 1168
NC-v4 EQc2:Low emitting materialsposted by Keith Robertson on
Maybe this question has been posed in another forum and I am not seeing it, but when does the new limit become applicable?
Primary vs. Functional Entry
NC-v4 LTc4:Surrounding density and diverse usesposted by Michelle Rosenberger on
This credit measures walking distance from the building's "main entrance" while the transit access credit specifies measurement from any "functional entrance".
Removing "other" costs from total construction cost of project
CS-2009 MRc4:Recycled Contentposted by Edgar Arevalo on
I am looking at a spreadsheet with the total construction cost for the project. I already shaved off HVAC, Electrical, Plumbing, and other equipment costs from the total (including audiovisua
AAMA ratings for U-Value vs. NFRC ratings
NC-2009 EAp2:Minimum Energy Performanceposted by Douglas Flandro on
Our rep has given us AAMA ratings to determine the U-Value of the curtain wall assemblies. LEED seems to be asking for NFRC ratings. Do we need to insist on the NFRC ratings?
2019 SDL Winter Summit - S&T Presentations
posted by RoseAnn Grimes on
Hello Everyone,
Here are some of the Show & Tell presentations from the 2019 SDL Winter Summit, enjoy!!
Best,
RoseAnn
Incomplete spaces - baseline calculations and FTE calculations
posted by Hana Altabbaa on
We have designed a project that is going for LEED NC certification under v3 2009. The project is about 200,000sqft and consists of six floors total. Floors 3,4,5 are meant to be totally
Does low-emitting and fuel efficient vehicles parking count as preferred parking?
CI-v4 LTc5:Reduced parking footprintposted by Ameet AA on
Hi,
Our project has a few parking spaces reserved for low-emitting and fuel efficient vehicles, does it count as preferred parking? Thanks.
Ayers Saint Gross publishes JUST Disclosure!
posted by Allison Wilson on
I've got exciting news to share! Ayers Saint Gross' JUST disclosure went live on Monday.
Scope of credit
CS-v4 EQc3:Construction indoor air quality management planposted by ilse angel on
During construction there is an stage when the contractor is building the slabs and columns of the levels above the ground floor.
v4 Healthcare?
posted by Rachel Manoguerra on
I am apart of team that is trying to decide on which rating system to use. Our project is an Outpatient Medical Center. It is not for acute or long-term care.