Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Smoking Rules within construction project boundaries

NC-v4 EQc3:Construction indoor air quality management plan
posted by  Marine Petrosyan  on 

Hi, All!

We are currently facing two major questions during the work with the construction project team. 

1
Sustainable Design Leader
HKS, Inc.
LEEDuser Premium Member
40 thumbs up
Tue Aug 5, 2025, 4:00 pm
4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Thu Aug 24, 2023, 6:31 am

Interior Project Water Performance

EBOM-v4.1 WEc1:Water Performance
posted by  yingling guan  on 

For interior project, if there is only one pantry faucet within the project scope.  And occupants of this project will use other indoor water fixtures or fittings installed out of the thi

1
Wed Apr 5, 2023, 1:59 pm

Quality Views from Skylight

Pilot-Credits EQpc117:Quality views in nonregularly occupied spaces
posted by  Yifeng Xu  on 

Hi All,

We have one project with skylight on the roof and thinking if it is eligible as the quality view. Considering:

0

Water bottle drinking fountain - water usage

NC-v4 WEc2:Indoor water use reduction
posted by  Erin Rowe  on 

I see that water-bottle fill stations / drinking fountains are not on the list of fixtures in the calculator. Do we just leave those out of the water savings calculations?

3
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Thu Apr 25, 2019, 4:16 pm
3
Fri Apr 6, 2018, 5:30 pm

EA advanced Energy metering credit (LEED v4)

NC-v4 EAc3:Advanced energy metering
posted by  Angelina Ten  on 

Dear all, Currently I have a project where energy meters comply with all the corresponding credit requirements except that they do not display energy demand.

1
Tue Apr 21, 2015, 9:15 pm

LEED documents

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Olga Kim  on 

Good afternoon all, I have a question about LEED certification. We produce high quality water basied paints in Kazakhstan. Our products are certificated by Kazakh Certification Center.

1
Wed Feb 11, 2015, 1:32 pm

Reverberation Time and BIG Open Area

NC-v4 EQc9:Acoustic performance
posted by  Avtua Kraveishvili  on 

If open plan office is linked with entrance, guest circulation areas and corridors from another zone (which totally takes about 2'000 m2), how we can calculate and predict Reverberation Time?

0