Forum quick links
Sprayed concrete as a temporary stabilization measure
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Michael E. Edmonds-Bauer on
Our project has around 10 levels of undergrouns parking. A huge ramp for earth-movement vehicles is being created as construction evolves.
CDWM Plan Sample or Template.
NC-v4 MRp2:Construction and demolition waste management planningposted by Olga Yuil on
Is there a template or sample for the construction and demolition waste management plan itself?
Rank the refrigerants from worst to best
posted by David Stern on
Good Evening;
Regional Priority - artic and antartica
posted by David Stern on
Good Evening;
What are the regional priority requirements for the Artic and Antartica ? I cannot seem to find them.
Thank You
Baseline System Selection -DES Guidelines
NC-v4 EAc2:Optimize energy performanceposted by Harshana Thimmanna on
Hi All,
Do water features need to be included in calculations?
NC-v4 WEp1:Outdoor water use reductionposted by Cindy Quinn on
I have a project that will have a water feature which will be a splash pad during most of the year and an ice rink for 6 weeks in the winter. How do I account for this in the Outdoor Water Us
Modelling acoustic performance
posted by Mona Lemoine on
Hello - Other than hiring an acoustic consultant, I am wondering what in-house tools you are using internally at the design stage for modelling acoustic performance?
Rainwater management
NC-v4 SSc4:Rainwater managementposted by Amr Elkranfely on
Now I'm working on a project located in a very hot climate country and arid region. The nature of the land their is a natural desert where water scarcity is a big challenge to the country.
Electric vehicles - EVSEs and EV Ready places
posted by Antti Karppinen on
Hi!
Option 2. Electric Vehicle Charging Infrastructure requires that "A parking space with EVSE cannot also be counted as EV Ready". Does this mean that