Replacement for the demolished walls

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Simon Sue  on 

In a CI tenant finish-out, if existing interior partitions are demolished and new interior partitions are constructed in an original configuration (not matching to the demolished partition lay

2
Sustainable Design Director
Boulder Associates Architects
LEEDuser Premium Member
20 thumbs up
Tue Mar 19, 2019, 7:46 pm

Building Area Method and System designation

NC-2009 EAp2:Minimum Energy Performance
posted by  Jorge Lopez de Obeso  on 

Hello everyone, I have a project with the following conditioned area categorization.

1st to 5h Floor are composed by:

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 19, 2019, 7:20 pm

Fire Station minimum parking?

NC-v4 LTc7:Reduced parking footprint
posted by  Erin Holdenried  on 

Looking for suggestions on how to determine the parking ratio for a Fire Station.  There doesn't seem to be any use within the Base Ratios Table that align with a Fire Station.

3
Artist, Curator, Writer
Teresa Stern Arts
LEEDuser Basic Member
20 thumbs up
Tue Mar 19, 2019, 5:49 pm
3
Tue Mar 19, 2019, 4:49 pm

All year round shaded area

CS-v4 SSc5:Heat island reduction
posted by  Frantisek Macholda  on 

Hi, we have a square atrium in the middle of the building.

1
Mon Sep 2, 2024, 7:08 pm

Chemical Inventory for material other than chemical....

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  PAWAN DAHIWAL  on 

How does material which don't have any chemical content OR no chemical used during its manufacturing but is a permanent building material, comply with credit? For example Granite OR marbl

1
Tue Apr 2, 2019, 11:45 pm
1
Mon Mar 25, 2019, 7:26 pm

Are designated smoking areas required?

EBOM-v4 EQp2:Environmental Tobacco Smoke Control
posted by  Anna Kaelin  on 

My project prohibits smoking onsite and within 50 ft of the building. There are no designated smoking areas on the property.

1
Mon Mar 18, 2019, 10:20 pm

Data Centre energy model baseline

NC-v4 EAp2:Minimum energy performance
posted by  Ameet AA  on 

Hello,

For a large data centre, I was thinking the baseline should be:

- HVAC: system 8

- CRAC fan power: Ls x 0.0021 + A as per ASHRAE table G3.1.2.9

4
Mechanical Designer
Integral Group
LEEDuser Basic Member
13 thumbs up
Mon Mar 18, 2019, 7:24 pm