Forum quick links
Infill Development points available for Previously Developed properties?
Homes-v4 LTc2:Site selectionposted by Edward Gulick on
The LEEDv4 for Homes Reference Guide is not explicit on whether a previously developed property is eligible for the Infill Development points. On the one hand, the suggested maximum point tot
Post-industrial and pre-consumer
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Kavita Karmarkar on
Hi all,
Documenting Master Site Credits
posted by Deborah Lucking on
I got this below from the LEED Help Center, which I find really confusing, and does not accord with the current LEED Online for Campus/Master Site format.
SRI value (or range) of FDOT #57 stone
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Heidi Carhide on
I'm working on a governmental project that uses Florida Dept of Transportation #57 stone as a landscaping material. The gravel is quarried in south Florida and is limestone rock. Does a
Calculating Conditioned Area
NC-v4 EAp2:Minimum energy performanceposted by Keith Wallace on
Given a building with all conditioned spaces, what is recommended or required to determine the conditioned area square footage? Do you take measurements from the exterior face of the exterior
Water-less Cooling Tower
CS-v4.1 WEc3:Optimize Process Water Useposted by John Bello on
Our cooling system does not use any water. Instead we are planning to use a R410-a refrigerant. Would this classify for full compliance with Option 2 or Option 3.
non-attainment area for PM2.5
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
In Europe which parameters shall be considered to establish whether the site is non-attainment area for PM2.5?
ID+C CI v4 - Innovation: Purchasing - lamps
EBOM-v4 MRc2:Purchasing - lampsposted by Anna McGee on
Hello - We're looking into the Innovation credit for low/no mercury lamps for our CI renovation. The innovation credit has the below notice:
Barriers in implementing Material Transparency in LEED v4 projects
posted by SUSAN THOMAS on
What are the challenges in determining the environmental qualities and human health impacts of building materials or products in LEED v4 projects?
Construction Waste Recycling Plant distance from Site
CI-v4 MRc6:Construction and demolition waste managementposted by Ana Mendoza on
Hello
We are currently working in a location where there aren't any gypsum recycling plant within a 200 mi radius. We have been looking