Forum quick links
LTc7 - Reduce parking footprint - examplary performance
NC-v4 LTc7:Reduced parking footprintposted by Maria Peralta on
Hello!
Ventilation Requirement for High Rise Residential
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jay Murray on
Question: Is it necesary to hard duct ventilation air into each bedroom within the apartment?
Existing building LEED BD+C og LEED O+M
posted by Piotr Podhajny on
I am trying to guide a client for LEED certification. It is for a work-clothes factory with administration, showroom, storage facility etc.
Interior Partitions Option 2: Strategy F without movable partitions?
NC-v4 EQc6:Interior lightingposted by Cindy Quinn on
Has anyone had success earning Interior Lighting Option 2: Strategy F with a project that doesn't have movable partitions? Our project was denied this strategy because we don't have movable p
Prerequisites Submitted under Campus
posted by Guillermo Hernandez Espinoza on
Hi everyone, I was wondering, since some of the prerequisites are Campus Eligible, does that means I don't have to submitted those prerequisites if earned for the LEED projects inside the campus ?
Materials Purchased by Contractors
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Alex Goulden on
Hello,
45% of Materials Cost Clarification
NC-2009 MRc4:Recycled Contentposted by William LaRose on
I am a new employee to a contractor and have been tasked with handling LEED for a project that is to be finished in a month.
Required spaces for IEQp1 calculator
NC-v4 EQp1:Minimum indoor air quality performanceposted by RDK E&S on
Hello,