ASHRAE 90.1:2010 - Manual or Partial Auto to 50%
NC-v4 EAp2:Minimum energy performanceposted by André Harms on
The requirement states that “Any automatic control device required … shall either be manual on or shall be controlled to automatically turn the lighting on to not more than 50% power”
IN - Innovation Credit - Social Equity in the Community
CI-v4.1 IN101:Innovationposted by Joya Bhandari on
If a project owner has its own NGO association, can they be eligible for this credit? They work with local NGOs.
Thank you!
Proposed building HVAC system (ASHRAE 90.1 (2010) Table G3.1.10.b)
CS-v4 EAp2:Minimum energy performanceposted by André Harms on
Hello. I am working on a Shell and Core submission. The tenant requirement specifies a VRF system with an EER=3.45 for the proposed building.
how can attachments (drawings, images) be sent in a CIR?
NC-v4 IPc1:Integrative processposted by Sara BENLOUBA on
Dear Everybody,
How contact GBCI for their advice on technical matters
NC-v4 IPc1:Integrative processposted by Sara BENLOUBA on
Dear everybody,
Group approach - Minimum requirement compliance
NC-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hello everyone!
I am working on 2 buildings that are registered in one project following the group approach.
Basement lobbies
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marni Punt on
We have a project with 3 lobbies located in basement parking.
Vestibules - CIR 10426 - Interpretation
NC-2009 EAp2:Minimum Energy Performanceposted by André Harms on
The CIR 10426 (http://www.usgbc.org/content/10426) creates the impression that in locations where the local code does not require vestibules they are not mandatory, if a "a narrative explaining how
New Construction project with warehouse and bus parking
NC-v4 LTc8:Green vehiclesposted by Dina El-Sady on
The project is a production building with a connected warehouse and small office building , the parking located within the LEED project boundary is inclusive of bus parking used for building occupa
Slab / Floor Insulation, is it mandotary
Homes-v4 EAp1:Minimum energy performanceposted by Omar Elrawy on
Hi,
For the prerequisite requirement to add R-19 insulation to floor / slab under energystar, is it required on every floor?
Knowing that all floors are airconditioned,