ESC Plan For A Warehouse Project
NC-v4 SSp1:Construction activity pollution preventionposted by Jourdan Younis on
Hello,
v4_Low Emitting Materials Calculator
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Thomas Bennett on
I am trying to fill out this LEED calculator for the 5 HVAC materials that we are using on a project, 440 Gasket Tape, Duct Sealant DP1015, Oatey No 5.
Mandatory Requirements and Applicable Exceptions: Section 8.1.5
CI-v4 EAp2:Minimum energy performanceposted by Waleed AlGhamdi on
In a LEED v4 CI project, we have a floor that will architecturally stay the same. New HVAC and new lighting fixtures (same ceiling and placement though).
Daylight simulation
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Danielle Waters on
If a project is running a simulation that shows the LUX color levels for each room on the plan, would the project have to still fill out a v2009 Daylight calculator?
Interior Reuse - shared walls with other businesses
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Lou Niles II on
Hello Can anyone give some advice on including Both sides or one side of interior walls for a Tenant Improvement where the other side of the wall is a space not in the scope.
Modeling Electric Heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on