Log in
Forum
Topic

Occupancy before building is finished

NC-2009 PIf4: Schedule and Overview Documents
posted by Victoria Rios Esteve on Jun 26, 2020, 11:51 am

Hi everyone! Im pretty sure this question is not rightly set in this category, but here we go...

We are working with a building that will be certified under v2009. The building is almost...

Last reply: Summer Minchew, Jul 3, 2020, 9:29 am

Batteries, mercury-containing lamps, and electronic waste

NC-v4 MRp1: Storage and Collection of Recyclables
posted by Maria Porter on Dec 19, 2019, 7:11 am

Chose to provide a recycling area for two of: batteries, mercury-containing lamps, and...

Last reply: Holly Ratafia, Jul 2, 2020, 11:12 pm

U.S. EPA TSCA Title VI ULEF Products

NC-v4 EQc2: Low emitting materials
posted by Marcia Weekes on Mar 12, 2019, 4:33 pm

Our project is working with a...

Last reply: Sophie Kerr, Jul 2, 2020, 10:54 am

90.1 2010 User's Manual versus the Standard

NC-v4 EAp2: Minimum Energy Performance
posted by David Hubka on Jul 1, 2020, 8:24 am

I assume the Standard must be followed when the User’s Manual contradicts it.

90.1 – 2010, Standard

9.4.1.3 (b)           “….reduce lighting power of each luminaire by a...

Last reply: David Hubka, Jul 2, 2020, 10:04 am

Monitoring Device for IAQ

NC-v4 EQp1: Minimum indoor air quality performance
posted by Dang Thi on Jun 30, 2020, 12:10 am

Hi,

I have an issue about monitoring device for constant volume system. In the credit language, for constant volume system, it require install a current transducer on the supply fan,...

Last reply: David Hubka, Jul 2, 2020, 9:57 am

ASHRAE Baseline Heating Fuel Type with Gas Process Loads

NC-v4 EAp2: Minimum Energy Performance
posted by Neil Bulger on Jun 16, 2020, 6:13 pm

I have a new office building where all space heating is designed to be electric heat pumps with supplemental electric resistance, including the outdoor air makup units using heat pumps. The...

Last reply: Marcus Sheffer, Jul 2, 2020, 9:35 am

Additonal Interior Lighting Power

Retail-CI-v4 EAc2: Optimize Energy Performance
posted by James Pack on Jul 1, 2020, 7:11 am

We are trying to calcuate the additional allowance for Display Lighting in a Jewellery store. When calcualting the allowance does the W/ft2 cover the individaul display area (display shelves /...

Last reply: Marcus Sheffer, Jul 2, 2020, 9:19 am

MRC7 Materials & Resource Calculator entries

Retail-CI-v2009 MRc7: Certified Wood
posted by Brandy McShan on Jul 2, 2020, 8:26 am

When filling out the calculator for the MRc7 credit for V2009, one of my products said it is an...

Institute of Transportation Engineers’ Transportation Planning Handbook, 4th edition, Table 11-12

NC-v4.1 LTc7: Reduced parking footprint
posted by chris buntine on Jun 23, 2019, 3:24 am

I haven't seen the newest edition but tried to answer the fire station question here:  https://leeduser.buildinggreen.com/forum/fire-station-minimum-parking   Log in or register to post comments ...

Last reply: Emily Purcell, Jul 1, 2020, 6:38 pm

Inclusion of selective Div. 12 products?

NC-2009 MRc4: Recycled Content
posted by Michelle Robinson Schwarting on Sep 23, 2015, 1:31 pm

Division 23. Since this is an NCv3 forum, I will focus on V3. Similarly, LI#3005, which addressed MEP work as well as furniture, does not apply to NCv3. When this and several other rulings came down, NCv2...

Last reply: Anya Fiechtl, Jul 1, 2020, 5:06 pm