Topic | Recent |
---|---|
CONSTRUCTION WASTE HEATED FOR CLINKER PRODUCTION, COUNTED AS WASTE DIVERSION?NC-v4 MRp2: Construction and demolition waste management planningposted by Olga Yuil on Apr 15, 2024, 3:55 pm
For a project located in Central America, construction waste is used for clinker production. For this purpose, construction waste is heated to temperatures above 900C. According to those... |
|
Wind PPA OR PV garden questionNC-v4 EAc5: Renewable energy productionposted by Kyu-min Lee on Apr 15, 2024, 1:29 pm
Hello,LEEDuser!!!! My project is planning to contract at least 10year more than 10 Gwh.(not confirmed about wind or PV but the amount is fixed, located in same utility service area) ...Last reply: Kyu-min Lee, Apr 15, 2024, 4:28 pm |
|
What are the key objectives of the Plastic Recycling Show in India 2024?NC-2009 MRc4: Recycled Contentposted by Stive John on Apr 15, 2024, 6:21 am
The Plastic Recycling Show in India 2024 aims to promote awareness and adoption of innovative recycling... |
|
Mean Lamp LumensEBOM-v4 SSc4: Light Pollution Reductionposted by Subhashkumar A on Apr 14, 2024, 11:59 am
Hi all! Last reply: Bill Swanson, Apr 19, 2024, 8:54 am |
|
MRc Low Emitting MaterialsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Emily Purcell on Apr 12, 2024, 1:41 pm
Overall: I like the simplified point & percentage threshold... |
|
Heat Island Reduction- vegetated surface- modular systemsNC-v4 SSc5: Heat Island Reductionposted by Ricardo Hernandez on Apr 12, 2024, 10:23 am
Hi Forum, can anyone confirm that a modular vegetated systems (plastic modules with ecomembrane, above ground) can count on the calculations for the vegetated surface, i would like to implement a... |
|
LEED Accredited Professional Credit- AP flexibilityLEED v5 BD+C/ID+C: Project Priorities and Innovation Public Commentsposted by Edgar Arevalo on Apr 11, 2024, 2:15 pm
So I'm working on LEED v4 ID+C projects where, after following advice from a post in this form for the LEED v4.1 version of this credit, I can use my AP BD+C credentials to comply with this... |
|
How to Model Proposed and Baseline HVAC system for a District level heating and Cooling systemNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Apr 11, 2024, 12:16 pm
Hi, I am working on a College Building where Cooling and Heating is done by Hot water and chilled water supplied to the building, Based on the user guide what I see is I need to model a... Last reply: Marcus Sheffer, Apr 11, 2024, 12:35 pm |
|
EBOM-v4.1 EQc2- European equivalentEBOM-v4.1 EQc2: Integrated pest managementposted by Margherita D'Alessio on Apr 11, 2024, 11:37 am
Hello everyone, Our Team is trying to achieve the credit by pursuing Option 2. Certified... |
|
Opt 2 Embodied Carbon/LCA Optimization- Eligible materials in European RegionNC-v4.1 MRc2: Environmental Product Declarationsposted by Kairi Noulik on Apr 11, 2024, 6:44 am
Good day I am working on projects in Estonia and we are trying to achieve the requirement for Opt 2 of this credit by choosing 5 materials from 3 different manufacturers. During my... |