Topic | Recent |
---|---|
CONSTRUCTION WASTE HEATED FOR CLINKER PRODUCTION, COUNTED AS WASTE DIVERSION?NC-v4 MRp2: Construction and demolition waste management planningposted by Olga Yuil on Apr 15, 2024, 3:55 pm
For a project located in Central America, construction waste is used for clinker production. For this purpose, construction waste is heated to temperatures above 900C. According to those... |
|
Recommendation for simple equipment purchased online for CO2 and TVOC measurement?EBOM-v4.1 EQp4: Indoor Environmental Quality Performanceposted by Olga Yuil on Jul 4, 2019, 5:00 pm
Could there be any recommendation of simple equipment purchased online for the measurement of CO2 and... Last reply: RICCARDO BALLESIO, May 16, 2023, 8:00 am |
|
What transit type is the Subway (underground) System?CI-v4 LTc3: Access to quality transitposted by Olga Yuil on Dec 13, 2017, 2:55 pmresponse LEEDCoach sends back, but in the meantime, you can look here and at a few other posts under this credit for some other perspectives: https://leeduser.buildinggreen.com/forum... Last reply: emily reese moody, Jan 16, 2018, 1:35 pm |
|
Submetering requeriments for exclusive chiller for tenant spaceCI-2009 EAc3: Measurement and Verificationposted by Maria Isabel Conde on Dec 13, 2017, 4:47 pm
The project is located within a building, its area is less than 75% of the total area of the building. The project has a chiller plant that only supplies the project area. Bearing in mind... Last reply: Marcus Sheffer, Dec 15, 2017, 10:21 am |
|
5% of the total siteCS-2009 WEc1: Water Efficient Landscapingposted by Carla Lopez on Jun 2, 2015, 10:54 pm
Hello, Last reply: Muge Karasahin, Oct 25, 2017, 6:38 am |
|
Hybrid UrinalsCI-2009 WEc1: Water Use Reductionposted by Nilda De Coutte on Mar 15, 2016, 2:50 pm
Hi, I would like to know if anyone has any information (case study, formal review, experience with) of any of the hybrid urinals currently available in the market. We are interested in installing... Last reply: Tristan Roberts, Jan 18, 2017, 11:12 am |
|
Pedestrian access- Community connectivityCS-2009 SSc2: Development Density and Community Connectivityposted by Maria Isabel Conde on Dec 22, 2016, 4:47 pm
Hello, Last reply: Allison Smith, Dec 22, 2016, 5:40 pm |
|
Interpretation ProblemCI-2009 EAc1.3: Optimize energy performance - HVACposted by Maria Isabel Conde on Jul 8, 2016, 12:46 pm
We have a problem with the interpretation of the information necessary to apply for this credit. Credit requirement explain that I have to meet one of the following: Air handlers that... Last reply: Maria Isabel Conde, Jul 12, 2016, 2:45 pm |
|
Equipment not list on CPGCI-2009 EAc1.3: Optimize energy performance - HVACposted by Maria Isabel Conde on Jul 1, 2016, 5:53 pm
Our project has a WSHP bigger than 135000 btu/h. According to CPG table 2.9.2 the efficiency required for WSHP up to 135000 btu/h is 14 EER and the WSHP of our project has a 14.1 EER. ... Last reply: Maria Isabel Conde, Jul 5, 2016, 12:23 pm |
|
Calculation based on chilled water metersRetail-CI-v2009 EAc5: On-Site Renewable Energyposted by Maria Isabel Conde on Apr 18, 2016, 4:56 pm
Our comercial interior project is located in a building that has photovoltaic panels that feed the central chilled water plant. We have: Last reply: Marcus Sheffer, Apr 25, 2016, 8:00 pm |