Individual workstation controls - Are they really needed?
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
So I need to ask this general question regarding the lighting controls section of this credit.
Natural Gas as process loads
NC-v4 EAp2:Minimum energy performanceposted by A&L SUSTENTABILIDADE on
Dear forum users,
We are modeling a manufacturing building that uses natural gas in its welding processes.
Should the natural gas consumption be included in the energy simulation?
ASHRAE 90.1 mandatory requirement for daylight dimming not met in many projects
NC-v4 EAp2:Minimum energy performanceposted by TANVEER ANSARI on
Hi,
We have been facing this problem on each and every new project in the region.
MRpc87 pursuit
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Kristin Rivera on
I've run into many instances where I was less than confident in the validity of recycling data from haulers.
Simplified Approach Option for HVAC Systems (ASHRAE 90.1-2016 Section 6.3) – EA Prerequisite (LEED v4.1 ID+C)
posted by Pongpitch J. on
I would like to confirm whether the Simplified Approach Option for HVAC Systems (ASHRAE 90.1-2016 Section 6.3) is acceptable for demonstrating compliance with EA Prerequisi
Metering heat pumps with shared ATES system
NC-v4 EAc3:Advanced energy meteringposted by Yara Ibrahim on
All heating/cooling in our building project is supplied by a heat pump, fed from an ATES system that is shared with other buildings on the property.
Number of fixtures assumption for tenant spaces
CS-v4 WEc4:Water meteringposted by Junaid Mujahid on
Hi Forum Users!
Overall Feedback on Pilot Credit
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Kavita Karmarkar on
As our project is located in Northern CA, it is not diffidult to achieve this credit as there are many haulers with third-party certified diversion rates (RCI) in the area.
Combination option?
NC-v4.1 LTc8:Electric Vehiclesposted by Joseph Snider on
Has anybody seen an option to install some EVs and then some EV ready to combine Option 1 and 2? In 2009, there was a way to run weighted calcualtions. We have a project doing a little