Daylight Simulation with Relux

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Christoph Dewald  on 

Hi, I am working on a project that is targeting IEQ 8.1. We are going to use option 1 to show credit compliance. For the simulation we use Relux.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Thu Aug 18, 2011, 12:33 pm

Do strippers need to comply with VOC requirements?

Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Louise Schlatter  on 

We are working on a large school renovation. They need to clean some floors with strippers... do those need to comply with VOC requirements? If so, would it fall under paints and coatings?

2
Sustainability and Environment Director
PROSOCO, Inc.
LEEDuser Basic Member
126 thumbs up
Thu Aug 18, 2011, 11:37 am

Applying to LEED 2009 for NC

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Emily Catacchio  on 

I'm working on a project that would like to apply this credit to a new construction building. The new building is part of a college campus, but the LEED boundary only includes the new building.

2
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Wed Aug 17, 2011, 9:22 pm
4
Assistant Project Manager, LEED v4
U.S. Green Building Council
LEEDuser Premium Member
90 thumbs up
Wed Aug 17, 2011, 7:53 pm

Evidence Required

Pilot-Credits PC12:Reduced Automobile Dependence
posted by  Méabh Browne  on 

We are working on LEED CI project and participating in this pilot credit, which we given the city centre location that we are in would be easily achieved.

2
Director, Department of Transportation
City of Pasadena, CA
LEEDuser Basic Member
27 thumbs up
Wed Aug 17, 2011, 5:27 pm

AGMBC Part II

posted by  Cara Mae Cirignano  on 
4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Aug 15, 2011, 8:13 pm

Window Replacement

Pilot-Credits PC19:Whole Building Reuse
posted by  Patrick Castelvecchi  on 

One thing to consider by requiring project teams to include windows in the calculation is areas where the exisitng windows cannot physically be retrofitted to meet the new performance criteria.

2
Fri Aug 12, 2011, 8:18 pm

Treating and Reusing Process Waste Water

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Prudence Ferreira  on 

In an existing winery facility we are capturing 100% of our process wastewater (which is significant) and treating it onsite in aerated retention ponds, then using it for vineyard irrigation.

4
Fri Aug 12, 2011, 4:05 pm

zone floor area

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Traci Stotts  on 

Is the 'zone floor area' in the prescriptive calcs bascially just the area on the floor plan that is determined by the width of the window x twice the height?

3
Director of Sustainability
DBR Engineering Consultants
LEEDuser Basic Member
244 thumbs up
Fri Aug 12, 2011, 3:35 pm

IEQc8.2_Views for Exemplary Performance - Documentation

CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spaces
posted by  Gail von Staden  on 

Dear Leeduser Forum :-) I'm working on a commercial interiors project that I hope can acheive the EP points.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Aug 12, 2011, 1:08 pm