For this credit the form has three columns -
Column 1 - % Regional
Colum 2 - Extraction Miles
Column 3 - Manufactured miles
We are not going for the regionally extracted point only the regionally manufactuered point. What is the % Regional credit for? How do you calulate the % Regional?
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11478 thumbs up
May 25, 2011 - 12:15 am
Beth, the % regional input indicates the portion of the given product/material that you are calling "Regional." If the whole product is considered regional, it's 100%. If half of it is from the region, and half is not, it's 50%. Regional is then broken down by extraction and/or mfr. location.
Sheela I
97 thumbs up
November 2, 2011 - 2:01 pm
We have had the same problem with the %. But when we split the costs based on the % contributing the calulation seemed to make more sense.