Forum quick links
Recycled Steel content
NC-2009 MRc4:Recycled Contentposted by Katie Ellsworth on
We have several steel items that have been purchased for our contractors project. Most of the items show a total recycled content, then a post- and pre-consumer recycled content.
Multi-family residential - ASHRAE 62.1 2007 - ch. 5 Natural Vent
NC-2009 IEQp1:Minimum IAQ Performanceposted by Michele Helou on
We have a mixed use retail - residential project with the residential units relying on natural ventilation with the required 4% operable window area to floor area ratio.
LEED Certification for Phase wise construction
NC-2009 MRc4:Recycled Contentposted by Ramesh Narayanan on
Dear Sir/Madam, I have few clarification of whether the old constructed portion material should be considered for all the materials credits. Project Details: The building has been developed by t
Option 1
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Jun Hashimoto on
I completed option 1. My LEED-CI project is a confidential project, but is located in a dense urban area with well-developed public transportation.
I was under the impression
posted by Bill Swanson on
I was under the impression from Chrissy Macken from USGBC during the first public comment phase that all aspects of LEED were up for comments. My suggestion to revise the BUG lighting system in th
LEED CS 2009 LEED ENERGY MODEL
CS-2009 EAc1:Optimize Energy Performanceposted by John Harrington on
My proposed system is a WSHP.
is a closed landfill automatically a brownfield?
NC-2009 SSc3:Brownfield Redevelopmentposted by Amanda Redmond-Neal on
My project is to be built on top of a landfill that was closed in 1961.