Forum quick links
Warehouse Flush Out
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Curt Pascoe on
Both NCv2.2 and v2009 are clear with the temperate and humidity constraints.
temporary use of hvac during construction
Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Keelan Kaiser on
I have another question similar to above. We have a project that is substantially complete with construction, the cleaning crews are in right now. Only flooring remains to be installed.
Off Site renewable energy -- Is elegible?
NC-2009 EAc2:On-Site Renewable Energyposted by Jose Salinas on
Hi, I have the following question: a company that is pursuing LEED certification. Owns a low impact renewable energy plant, but this plan, that is a pass hidraulic plant on a river, is off-site.
Leed CS for Bus Station.
CS-2009 EAc1:Optimize Energy Performanceposted by Donovan Aguirre on
The project I am working on is a bus station that has an enclosed retail area with an underground parking and an outdoor above ground parking space.
LEED ND International - India
posted by Gurpreet Misra on
Hello: This project is in Rural India. Water and Waste Water systems are generally responsibility of developers rather than municipalities.
Warm mix asphalt
NC-2009 IDc1:Innovation in Designposted by Aliesa Adelman on
Has anyone had luck going after an ID credit for using warm mix asphalt?
Policy, "Measurement and Records"
EBOM-2009 MRp1:Sustainable Purchasing Policyposted by Dennis Palmer on
The example provided for each policy specifically states measured values, for example Durable Goods Procurement measured value is within a given year at least 40% of the purchase shall be energy st
Appropriate Fenestration U-value for Baseline Model
NC-2009 EAp2:Minimum Energy Performanceposted by PATRICK CORRIGAN on
I can not tell, from either ASHRAE 90.1-2007 or from the LEED User's Manual, what U-value I am supposed to use for the baseline vertical glazing.