Very good presentation,
posted by Nelina Loiselle on
Very good presentation, however I can not find the "Opt In" option on my GBCI My Credentials page? According to the presentation we have until Aug. 3rd as the first possible deadline date.
Steel structure enamel
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by javier bolanos zeledon on
Hi, this is a retrofit of an existing building where all the exterior structural walls are being replaced and also the interior walls.
SSc4 EBOM v2.2
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Sheryl Swartzle on
Our project is 750,000 sf office with 1277 occupants. Project is located in Miami and has it's own parking garage.
Calculating material costs in MRc4 and MRc5
NC-2009 MRc4:Recycled Contentposted by Alexander Aaltonen on
I have similar concerns as Maria described earlier, and I would really appreciate some advice on how to calculate material costs in a case where a sub-contractor is performing concrete works on-sit
Greenhouse
Schools-2009 EAc1:Optimize Energy Performanceposted by Lisa Logan on
Client is adding greenhouse to the school project - sort of late in the game. Does this space get included in our energy calcs? I am assuming yes and that there is no way around it.
Signage Details?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Marketing Coordinator on
Hi, I'm working on a LEED 2009 for Schools project and just rec'd my Design review comments.
Tenant Layout
CS-2009 IEQp1:Minimum IAQ Performanceposted by Dan Forino on
For our LEED CSv2.0 project, we have been asked to provide a proposed tenant layout for approximately 6 office spaces.