Parking garage under building
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by AshLee Eustace on
I have a building with the first two floors are made up of a parking garage, and the floors above are condominiums.
Avoidance of Chemicals of Concern in Building Material
posted by Tom Lent on
I'm very pleased to see this credit (the last one in Table 2 above) added to the mix.
# Of Testing Locations
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Dan Forino on
Our project single floor mixed use space, with a large single heat recovery unit providing outside air to all of the spaces.
Views and Line of Sight
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Sonrisa Lucero on
If only a HORIZONTAL direct line of sight from 42" to the exterior window will ultimately allow an area to qualify as having a view, why have the discussion about glazing from 30" to 90" at all?
Don't misread the outcome
posted by Bill Swanson on
The judge only said the plaintiffs have no standing to file a lawsuit.
Expanding on the Judges ruling
posted by Barry Giles on
Judge Sand said, “Because there is no requirement that a builder hire LEED-accredited professionals to attain LEED certification".
VOC's for exterior paint?
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Renee Shirey on
Has anybody had any problems with the issue of exterior paint on exterior door frames?
Modeling program advice
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Susan M. Kaplan on
We are trying to evaluate the best way of meeting this requirement through Option 1 - Simulation according to the latest (May 2011) Addenda changes (min. 10 fc on Sept.
Using Solatubes with the Prescriptive Method
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Dana Murdoch on
Has anyone been able to calculate the daylighting provided by Solatube's with the prescriptive method?