Underground Storage Chambers
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Marco Valerio Ceccotti on
To reduce runoff peak and quantity our project team used an embedded underground chambers system.
Registered Campus Projects, Approaches, Credits
posted by Ali Scander on
Hello, I just started a campus project. There is only one project registered on LEED online as "xxxx Campus" . I don't know which approach was taken for the credits.
demolition of existing facade
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
Some years ago the facade of an existing building was demolished. The facade was completely glazed. The structure of the building (pillars, beams) was conserved.
Process Energy Exceptional Calculation
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Hello, we are considering attempting the exceptional calculation method allowed in Section G2.5 for process load savings on a hospital project: the design is proposing equipment sterilization throu
Pump Room, STP Room & Guard Room Within LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Aswin M on
We have a factory project to be registered under LEED New Construction.
Water Heater and Water Coolers
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Shuchita Gupta on
Hi , Are Water Heaters ( under a separate Water heater category ) and water cooler ( under others category ) under energy star website require energy star compliance , since the categories listed
Fire Extinguisher & Cabinet (MRc4 & MRc5)
NC-2009 MRc4:Recycled Contentposted by Elliot Young on
Hi, we just received a submittal for fire extinguishers and recessed fire extinguisher cabinets - claiming to have recycled content and regional materials.
Guns to Rebar for Innovation Credit
NC-2009 IDc1:Innovation in Designposted by Rachel Manoguerra on
I have a project that bought and used rebar in their facility that was from a program called "Guns to Rebar". Guns were collected and melted down and sold as rebar.
New Option: Outdoor walking path
Pilot-Credits EQpc78:Design for active occupantsposted by Stephanie Graham on
I'd like to see an option for a walking/running path on the site of at least a mile in length and/or fitness cross-training stations at intervals along the path.
Entryway systems length - Why 10 Feet not 9?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Ahmed Mosa on
Why Entryway systems are at least 10 feet not 9 or 8?