Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

New Option: Outdoor walking path

Pilot-Credits EQpc78:Design for active occupants
posted by  Stephanie Graham  on 

I'd like to see an option for a walking/running path on the site of at least a mile in length and/or fitness cross-training stations at intervals along the path.

3
Thu Feb 4, 2016, 3:44 pm

Entryway systems length - Why 10 Feet not 9?

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Ahmed Mosa  on 

Why Entryway systems are at least 10 feet not 9 or 8?

4
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Feb 4, 2016, 6:06 am

Square Footage of Parking Areas

NC-2009 PIf2:Project Summary Details
posted by  Deirdre Espiritu  on 

Where are the guidelines on how to do this takeoff? Because parking is connected by vehicle circulation spaces as well is it correct to just use the area of the actual parking spaces?

2
Senior Sustainability Manager
WSP
LEEDuser Expert
53 thumbs up
Tue Feb 2, 2016, 4:58 am

What exactly "parking area" means?

NC-2009 PIf2:Project Summary Details
posted by  Alicja Bieszyńska  on 

I found here two contrary oppinions regarding what area of a building's garage that should be excluded from the gross building area calculations. Is it just the parking spots or the area covered by

2
Tue Feb 2, 2016, 4:53 am

Dark underground ballroom and regularly occupied space exception

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Olivier Brouard  on 

Hi everyone, Working on a conference center, we are close to get to Gold Certification by 2 points.

5
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Sat Jan 30, 2016, 1:39 am

CHP District Energy System

NC-2009 EAp2:Minimum Energy Performance
posted by  Emmanuel Pauwels  on 

We are working on the certification of a building that will be connected to a DES using a CHP plant.

6
Fri Jan 29, 2016, 9:25 pm

Old to be reused equipement

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Kalyan Nishtala  on 

Hi, I am currently working on an office building which is aiming for LEED Silver under CI (2009).

4
Fri Jan 29, 2016, 7:29 pm

Calculation method

CS-2009 EAc2:On-site Renewable Energy
posted by  Ciaran McCabe  on 

Hi to target this credit for a new project do you need an energy model to predict what 1% energy cost of is there an alternative approach ?

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jan 29, 2016, 2:46 pm

Green Wall

NC-2009 WEc1:Water Efficient Landscaping
posted by  Paula Hernandez  on 

Hi, our project is considering a green wall with drip irrigation. How do you declare that?

6
LEED AP BD+C, LEED Project Reviewer, Senior LEED Specialist
LEEDuser Basic Member
5 thumbs up
Fri Jan 29, 2016, 9:43 am

MODELLING PUMP IN PROPOSED CASE.

NC-2009 EAp2:Minimum Energy Performance
posted by  VEL MUTHU  on 

I am Currently working in a project aiming for certification under group certification. I am using DES V2 guideline and opting option 1.

3
Thu Jan 28, 2016, 7:37 pm