Topic | Recent |
---|---|
Credits substitution to v4.1LEED v4.1 Discussion Forumposted by Instra Ingenieros on Sep 21, 2022, 2:57 am
We are trying to upload the evidences of a project to LEED online (v4, BD+C Core and Shell), but we are having trouble with those credits that pursue version 4.1. Despite credit substitution is... |
|
v4 or v4.1?LEED v4.1 Discussion Forumposted by Diego Lodoli on May 27, 2022, 5:27 amthe rest of the versions still do; they have switched platforms to tracking efforts in Arc, at least as far as I know. The O&M-dedicated forum page(s) within LEEDuser would probably give you some more... Last reply: Lauren Richardson, Sep 12, 2022, 4:08 pm |
|
GFA calculation for extremely thick wallsNC-v4 IPc1: Integrative processposted by Filippo Weber on Sep 2, 2022, 4:56 am
Hi, Last reply: Filippo Weber, Sep 2, 2022, 9:37 am |
|
REACH registration numberNC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Francesco Passerini on Jul 8, 2019, 5:53 am
In safety data sheets the calcium diformat is labeled with REACH registration number 01-2119486476-24-xxxx Therefore I would think that it is included in the REACH lists but in the REACH... Last reply: allen cole, Aug 15, 2022, 8:33 pm |
|
Renewable Energy CalculatorLEED v4.1 Discussion Forumposted by Davide Liviero on Jul 13, 2020, 10:33 am
Hello everyone, I am currently working on LEED v4.1 BD+C Credit EAc5: Renewable Energy but I cannot find the LEED Renewable Energy Calculator available online for download. Is anybody able... Last reply: Meghan Cole, Jul 12, 2022, 11:20 am |
|
Data Center load for Renewable Energy designData-Centers-NC-v4 EAc2: Optimize Energy Performanceposted by Instra Ingenieros on Jun 20, 2022, 12:20 pm
We have a question about the energy simulation of a Data Center. We have completed the v4 Minimum Energy Performance Calculator introducing full IT and initial IT loads. After completing the... Last reply: Tyler Thumma, Jun 29, 2022, 8:32 pm |
|
Quality View_Views into AtriumNC-v4.1 EQc8: Quality Viewsposted by Ilaria Colombo on Jan 28, 2022, 10:18 am
Hi everyone, We have an office building with two floors and an internal atrium that crosses them. My first question is, for the alternative view into atrium can I consider all the... Last reply: Sara Goenner Curlee, Jun 23, 2022, 3:56 pm |
|
Prerequisite questions for Minimum Energy Performance v4.1NC-v4.1 EAp2: Minimum Energy Performanceposted by Greenlab on May 10, 2022, 11:24 am
For the prerequisite, can we obtain it, if we only achieve improvements on one of our indicators (Cost or... Last reply: Greenlab, May 11, 2022, 4:27 am |
|
LTc5- Heat Island Reduction- examplary performanceNC-v4 SSc5: Heat Island Reductionposted by Maria Peralta on Jul 4, 2019, 5:17 am
Hello, I have a doubt about the examplary performance of this credit. In the project with I am working doesnt has a parking and I achieved the option 1, so at is says in the LEED guide:... Last reply: emily reese moody, Apr 30, 2022, 12:43 pm |
|
LOCALIZATION OF STORAGE AND COLLECTION OF RECYCLABLESHospitality-NC-v4 MRp1: Storage and Collection of Recyclablesposted by Andrea gamio on Apr 25, 2022, 11:57 am
Well, my answers is about the better location of the dumpsters. Our project is a boutique hotel in the historic neigtboardhood town of spain, and the building is smaller. I can´t find in the... |