Forum quick links
Voltage drop
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
Folks, Is there any exception for the 2% and 3% voltage drop? We are working on a subway station and we were able to achieve 3,5% to the feeders and 3% to the to the branch circuits.
Option 1: Shared Lot/Outside LEED Boundary
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by JOHN COOK on
We have a major renovation project where the building shares a small parking lot with three other buildings within a campus setting.
Submetering
NC-2009 EAc5:Measurement and Verificationposted by Jatuwat Varodompun on
For Option D, do we need submetering? and can it be analyzed using only whole building energy? if we required submetering, what level we have to monitored eg HVAC, lighting, process?
What about on-site renewable energy, factored or not?
Schools-2009 EAc6:Green Powerposted by Keelan Kaiser on
If we have some on-site renewable energy (pv and wind), does it get calculated for a net energy use, or does this credit restrict to the total gross baseline amount calculated by the energy model (
LEED boundary to include displaced parking lot?
posted by Iris Amdur on
My project is a new residential tower (with an underground parking garage), which will be constructed on an existing parking lot that serves an adjacent residential tower.
Leasing agreement
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Michael E. Edmonds-Bauer on
Does the MER13 need to be requested to future tenants by a leasing agreement?
FTE for a Barracks
NC-2009 PIf3:Occupant and Usage Dataposted by Christopher Sawyer on
My project is a military barracks for 650 cadets on a campus.
Concerns about the proposed transition between V3 & V4
posted by Rob Watson on
Currently, the proposal is to have a very long uptake period for V4: June 2013 for the ballot and end-of-2013/early-2014 for the launch.
How to start up an existing precertification?
posted by Sara Neff on
I have inherited two precertified projects and am frankly confused as to how to go about certifying them now.
zip code
NC-2009 PIf2:Project Summary Detailsposted by charles bell on
I can't change the zip code on PI f2. Is this linked to some other form?