Log in
Forum
Topic

Daycare- considered a school for bike rack calculations

Schools-NC-v4.1 LTc6: Bicycle facilities
posted by Keith Robertson on Jun 12, 2019, 2:26 pm

We are working on a project where 2/3rd of the programmed space is for K-8 and 1/3 of the programming is dedicated to a daycare, Pre-K.

I am wondering if I can determine the number of...

Minimum Indoor Air Quality Performance Calculator: critical zones and demand-controlled ventilation

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Vincent Dupuy on Jun 13, 2019, 4:22 pm

We are working on certifying a building (...

Making the Case for MRc1 at Airports

EBOM-v4 MRc1: Purchasing - ongoing
posted by Justin Schwartz on Jun 19, 2019, 5:15 pm

Good afternoon everyone,

The team I am working with is advocating for MRc1 for LEED...

New retail store in an existing building

Retail-CI-v4 LTc5: Reduced parking footprint
posted by Charlotte Bodnar on Jun 21, 2019, 2:17 pm

The store is being renovated and is located in an existing building.

The employees of the store can have access to the underground parking (only parking available on site) of that building...

Indoor carpet with NFS Sustainability certificate.

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Osama Touni on Jun 24, 2019, 5:24 am

Hi, 

We have type of indoor carpet in our project that achieved NFS Sustainability certificate 'Gold Certification', my question is this certificate meet now the credit requirement ? ...

EN 717-1:2014

NC-v4.1 EQc2: Low-emitting materials
posted by LEED Pro Consultant on Jun 24, 2019, 6:38 pm

Hi,

We are reviewing a product to determine compliance with the...

If treatment is used, cycles may exceed the number of cycles i the Table

NC-v4 WEc3: Cooling tower water use
posted by Sue Bryant on Jun 25, 2019, 3:52 pm

The FORM in LOL next to the Table: Potable water analysis, says that if treatment is used, cycles may exceed the number of cycles in the Table. 

What does this mean? If treatment is used,...

Size of shower and changing facilities

Data-Centers-NC-v4 LTc6: Bicycle facilities
posted by Marion THIBAULT on Jun 27, 2019, 8:42 am

Hi,

Do we have minimum requirements for the size and configuration of changing facility shower ?

Thanks
Marion

Interior Reuse- shared walls with other businesses

CI-v4 MRc2: Interiors life-cycle impact reduction
posted by Lou Niles II on Jun 27, 2019, 2:05 pm

Hello Can anyone give some advice on including Both sides or one side of interior walls for a Tenant Improvement where the other side of the wall is a space not in the scope. The other side of...

Daylight simulation

NC-2009 IEQc8.2: Daylight and views - views
posted by Danielle Waters on Jun 27, 2019, 4:33 pm

If a project is running a simulation that shows the LUX color levels for each room on the plan, would the project have to still fill out a v2009 Daylight calculator? Or would the simulation...